Patton electronic 5200 Planning the installation, Site log, Network information, Network Diagram

Page 21

SmartNode 5200 Getting Started Guide

3 • SmartNode installation

 

 

Planning the installation

The mains outlet that is utilized to power the equipment must be within 10 feet (3 meters) of the device and shall be easily accessible.

Before installing the gateway router device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 21)

Gather IP related information (see section “IP related information” on page 22 for more information)

Install the hardware and software needed to configure the SmartNode. (See section “Software tools” on page 22)

Verify power source reliability (see section “Power source” on page 22).

After you have finished preparing for gateway router installation, go to section “Installing the gateway router” on page 22 to install the device.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 4.

 

Table 4. Sample site log entries

 

 

Entry

Description

 

 

Installation

Make a copy of the installation checklist and insert it into the site log

 

 

Upgrades and maintenance

Use the site log to record ongoing maintenance and expansion history

 

 

Configuration changes

Record all changes and the reasons for them

 

 

Maintenance

Schedules, requirements, and procedures performed

 

 

Comments

Notes, and problems

 

 

Software

Changes and updates to SmartWare software

 

 

Network information

Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections.

Network Diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components.

Planning the installation

21

Image 21
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Cabling End user license agreement List of Figures List of Tables About this guide AudienceStructure Impaired functioning PrecautionsSafety when working with electricity General observations General conventions Typographical conventions used in this documentGeneral information Chapter contentsSmartNode SmartNode 5200 overviewWAN ETH 0/0 SmartNode 5200 rear panelLED SmartNode 5200 front panelApplications overview Typical application IntroductionSmartNode installation Network Diagram Planning the installationSite log Network informationInstalling the gateway router Connecting the 10/100Base-T Ethernet LAN and WAN cables Installing cablesRouter front panel LEDs Initial configuration Connecting the SmartNode to your laptop PC Connecting the SmartNode to your laptop PCFactory-default IP settings Configuring the desired IP addressLogin Changing the WAN IP addressLAN Connecting the SmartNode to the networkLoading the configuration optional Additional information Contacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA RMA numbers Out-of-warranty serviceAppendix a Compliance information Compliance Low-Voltage Directive SafetyCE Declaration of Conformity Authorized European RepresentativeAppendix B Specifications IP services Voice signallingData connectivity ManagementWeight and power dissipation DimensionsOperating temperature Operating environmentAppendix C Cabling Ethernet Typical Ethernet straight-through cable diagramAppendix D Port pin-outs Pin Signal Appendix E SmartNode 5200 factory configuration SmartNode 5200 factory configuration Interface eth1 Authentication Outbound Authenticate Bind interface eth0 router no shutdown Appendix F End user license agreement End User License Agreement Other licenses Termination