Patton electronic 5200 manual Appendix C Cabling

Page 39

Appendix C Cabling

 

Chapter contents

 

Introduction

40

Ethernet

40

39

Image 39
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Cabling End user license agreement List of Figures List of Tables About this guide AudienceStructure Impaired functioning PrecautionsSafety when working with electricity General observations General conventions Typographical conventions used in this documentGeneral information Chapter contentsSmartNode SmartNode 5200 overviewWAN ETH 0/0 SmartNode 5200 rear panelLED SmartNode 5200 front panelApplications overview Typical application IntroductionSmartNode installation Network information Planning the installationNetwork Diagram Site logInstalling the gateway router Connecting the 10/100Base-T Ethernet LAN and WAN cables Installing cablesRouter front panel LEDs Initial configuration Connecting the SmartNode to your laptop PC Connecting the SmartNode to your laptop PCChanging the WAN IP address Configuring the desired IP addressFactory-default IP settings LoginLAN Connecting the SmartNode to the networkLoading the configuration optional Additional information Contacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA RMA numbers Out-of-warranty serviceAppendix a Compliance information Authorized European Representative Low-Voltage Directive SafetyCompliance CE Declaration of ConformityAppendix B Specifications Management Voice signallingIP services Data connectivityOperating environment DimensionsWeight and power dissipation Operating temperatureAppendix C Cabling Ethernet Typical Ethernet straight-through cable diagramAppendix D Port pin-outs Pin Signal Appendix E SmartNode 5200 factory configuration SmartNode 5200 factory configuration Interface eth1 Authentication Outbound Authenticate Bind interface eth0 router no shutdown Appendix F End user license agreement End User License Agreement Other licenses Termination