Patton electronic 5200 manual Cabling

Page 5

SmartNode 5200 Getting Started Guide

Table of Contents

 

 

 

Changing the WAN IP address

27

 

Connecting the SmartNode to the network

28

 

Loading the configuration (optional)

29

 

Additional information

30

5 Contacting Patton for assistance

31

 

Introduction

32

 

Contact information

32

 

Patton support headquarters in the USA

32

 

Alternate Patton support for Europe, Middle East, and Africa (EMEA)

32

 

Warranty Service and Returned Merchandise Authorizations (RMAs)

32

 

Warranty coverage

32

 

Out-of-warranty service

33

 

Returns for credit

33

 

Return for credit policy

33

 

RMA numbers

33

 

Shipping instructions

33

A

Compliance information

34

 

Compliance

35

 

EMC

35

 

Low-Voltage Directive (Safety)

35

 

PSTN Regulatory

35

 

CE Declaration of Conformity

35

 

Authorized European Representative

35

B

Specifications

36

 

Data connectivity

37

 

Voice signalling

37

 

IP services

37

 

Management

37

 

Operating environment

38

 

Operating temperature

38

 

Operating humidity

38

 

System

38

 

Dimensions

38

 

Weight and power dissipation

38

C

Cabling

39

 

Introduction

40

 

Ethernet

40

D

Port pin-outs

41

 

Introduction

42

 

Ethernet

42

E SmartNode 5200 factory configuration

43

 

Introduction

44

5

Image 5
Contents SmartNode Mailsupport@patton.com Summary Table of Contents Table of Contents Cabling End user license agreement List of Figures List of Tables Structure About this guideAudience Impaired functioning PrecautionsSafety when working with electricity General observations General conventions Typographical conventions used in this documentGeneral information Chapter contentsSmartNode SmartNode 5200 overviewWAN ETH 0/0 SmartNode 5200 rear panelLED SmartNode 5200 front panelApplications overview Typical application IntroductionSmartNode installation Network Diagram Planning the installationSite log Network informationInstalling the gateway router Connecting the 10/100Base-T Ethernet LAN and WAN cables Installing cablesRouter front panel LEDs Initial configuration Connecting the SmartNode to your laptop PC Connecting the SmartNode to your laptop PCFactory-default IP settings Configuring the desired IP addressLogin Changing the WAN IP addressLAN Connecting the SmartNode to the networkLoading the configuration optional Additional information Contacting Patton for assistance Patton support headquarters in the USA Warranty coverageContact information RMA numbers Out-of-warranty serviceAppendix a Compliance information Compliance Low-Voltage Directive SafetyCE Declaration of Conformity Authorized European RepresentativeAppendix B Specifications IP services Voice signallingData connectivity ManagementWeight and power dissipation DimensionsOperating temperature Operating environmentAppendix C Cabling Ethernet Typical Ethernet straight-through cable diagramAppendix D Port pin-outs Pin Signal Appendix E SmartNode 5200 factory configuration SmartNode 5200 factory configuration Interface eth1 Authentication Outbound Authenticate Bind interface eth0 router no shutdown Appendix F End user license agreement End User License Agreement Other licenses Termination