TP-Link TL-SL1226/TL-SL1351 manual Rack Installation

Page 12

Gigabit Uplink Unmanaged Switch

Rack

Figure 2-3 Rack Installation

Caution:

Please set 5~10cm gaps around the device for air circulation. Please avoid any heavy thing placed on the device.

Please mount devices in sequence from the bottom to top of the rack and ensure a certain clearance between devices for the purpose of heat dissipation.

08 Installation

Image 12
Contents Installation Guide Copyright & Trademarks FCC Statement CE Mark WarningRelated Document About this Installation Guide AudienceConventions Contents Features Cccccccccc IntroductionProduct Overview Port Feature AppearenceFront Panel LEDsPower Socket Rear Panel10/100/1000Mbps Port SFP Port for TL-SL1351 OnlyInstallation Package ContentsSafety Precautions Temperature/Humidity Site RequirementsClearness Electromagnetic InterferenceInstallation Tools Installation SiteLightening Protection Product Installation Desktop InstallationRack Installation Rack Installation Lightning Protection Cabling ReasonablyRequirements for Cabling Outdoors Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential BondingUse Lightning Arrester Equipotential BondingGrounding Terminal Equipotential Bonding Cable Verify Installation ConnectionEthernet Port SFP PortPower On InitializationAppendix a Hardware Specifications FCC, CEAppendix B Technical Support Gigabit Uplink Unmanaged Switch Mail support@tp-link.com 7106504529 Rev4.0.0