Gigabit Uplink Unmanaged Switch
Rack
Figure 2-3 Rack Installation
Caution:
■■ Please set 5~10cm gaps around the device for air circulation. ■■ Please avoid any heavy thing placed on the device.
■■ Please mount devices in sequence from the bottom to top of the rack and ensure a certain clearance between devices for the purpose of heat dissipation.
08 Installation