TP-Link TL-SL1226/TL-SL1351 manual Power On, Initialization

Page 20

Gigabit Uplink Unmanaged Switch

4.4 Power On

Plug in the female connector of the provided power cord into the power socket of the device, and the male connector into a power outlet as the following figure shown.

Figure 4-3 Connecting to Power Supply

Note: The figure is to illustrate the application and principle. The power plug you get

from the package and the socket in your situation will comply with the regulation in

your country, so they may differ from the figure above.

4.5 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indica- tors will respond as follows:

For TL-SL1226, the Power LED indicator will light up first and remain ON. After about three seconds, all port LED indicators will light up for three seconds and then go off. This process indicates that the device is successfully initialized.

For TL-SL1351, the Power LED indicator will light up first and remain ON. Other LED indicators will light up for one second and then go off. This process indicates that the device is successfully initialized.

16 Connection

Image 20
Contents Installation Guide Copyright & Trademarks FCC Statement CE Mark WarningConventions Related Document About this Installation GuideAudience Contents Product Overview FeaturesCccccccccc Introduction Port Feature AppearenceFront Panel LEDsPower Socket Rear Panel10/100/1000Mbps Port SFP Port for TL-SL1351 OnlySafety Precautions InstallationPackage Contents Temperature/Humidity Site RequirementsClearness Electromagnetic InterferenceLightening Protection Installation ToolsInstallation Site Rack Installation Product InstallationDesktop Installation Rack Installation Requirements for Cabling Outdoors Lightning ProtectionCabling Reasonably Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential BondingUse Lightning Arrester Equipotential BondingGrounding Terminal Equipotential Bonding Cable Verify Installation ConnectionEthernet Port SFP PortPower On InitializationAppendix a Hardware Specifications FCC, CEAppendix B Technical Support Gigabit Uplink Unmanaged Switch Mail support@tp-link.com 7106504529 Rev4.0.0