3. Charging the battery

{The battery charger of the UPS automatically charges the battery whenever the power cord of UPS is connected to a acceptable utility power.

{When UPS is running for the first time, charge the UPS for at least 6 hours to ensure batteries inside are fully charged before operation.

{You may immediately use the UPS without having to wait for the batteries to be fully charged. However, it is advisable not to do this as UPS will have a shorter back-up time than expected if such action is taken.

Connecting the battery bank

1.Utilize the battery connection cable packed with the battery bank.

2.Connect on one end of the cable to the external battery connector of UPS, and the other end to that of the battery bank.

3.Warning: For safety reason, the manufacturer suggests that ONE UPS CONNECTS AS MANY AS FIFTEEN EXTERNAL BATTERY BANKS.

Fig 3-3 UPS Connected to External Battery Bank

4.The battery banks should be installed by service personnel.

A.According to UL 1778 safety requirement: in order to remove the battery power cord emergently, please plug in the power cord directly.

B.According to EN50091-1-1 safety requirement: beside plugging in the battery power cord, the battery power cord need to be fixed with the screws.

4.Connecting the load

{Calculate power consumption of your loads to ensure that the overload condition will not happen.

{Plug the power cord of the equipment into the output receptacles on the rear panel of the UPS.

15

SHEET 16 TO 17

Image 16
Contents Sheet 1 to Important Safety Instructions UL safety instructionsOther safety notes For installation TUV safety instructionsOther safety instructions EC conformity declaration Introduction Theory of operationFeature High power densityPFC Power Factor Correction Complete ProtectionSafety approvals Intelligent designConsiderate design Green function designAnnotation and symbol Read before OperationOperation Panel Sheet 11 to Rear Panel Sheet 13 to Installation Before InstallationInstallation Unpacking If input type is terminal type UPSCharging the battery Connecting the battery bankConnecting the RS-232/Dry contact Sheet 18 to Cold start when utility is not present OperationTurning on the UPS Turning OFF the UPSUPS self-test Silence functionSheet 21 to UPS internal fault Derating powerStoring the message into Eeprom Programmable output OptionalMaintenance Placement Troubleshooting Problem Possible Cause SolutionFault Message Communication Interface RS-232Dry Contact Sheet 29 to Technical specifications Sheet 31 to END