Compaq 3000 manual Installation and Maintenance, Installation Guidelines

Page 52

3

Installation and Maintenance

This chapter describes how to install the Controller Shelf in a RETMA or metric-style storage cabinet and then make the cable connections to the UPS, Device Expansion Shelves and host system. The maintenance section describes how to interpret the status of the LEDs on the front panel of the Controller Shelf. The chapter also describes how to replace a Field Replaceable Unit (FRU).

3.1Installation Guidelines

The Controller Shelf installation process consists of mounting the support brack- ets for the specific number of shelves in your subsystem configuration, setting the UltraSCSI bus termination and target ID addresses, and making the power and SCSI cable connections between the rackmount components. The section is divided into four separate cabling procedures, one for each of the number of De- vice Expansion Shelves in your specific subsystem configuration.

CAUTION

To prevent the possible loss of data, always shut- down your subsystem from the StorageWorks Command Console (SWCC). Do not turn off sys- tem power before shutdown is issued. When shutdown is issued from SWCC, the controller first flushes the cache to the disk drive, then stops blinking.

Use the following guidelines when installing the Controller and Device Expan- sion Shelves. They apply to both RETMA and metric cabinet designs.

For stability and safety, arrange the components in the cabinet using a bot- tom-up approach.

Cable length is critical when locating the shelves in the cabinet. Keep shelves grouped together to minimize cable length problems.

EK–SMCPQ–UG. C01

3–1

Image 52
Contents RAID Array 3000 Controller Shelf Page Japan USA Contents Installation and Maintenance Second Controller OptionFigures Tables Removing the Controller from the ShelfRevision Record About This Guide Associated Documents Associated DocumentsConventions Style ConventionsNomenclature Convention RAID Advisory Board Description RAID Array 3000 UsageWho to contact in Europe Support and Services Who to contact in the AmericasWho to contact in Asia Pacific Product Overview Product DescriptionRAID Array 3000 Controller Shelf RAID Array 3000 6-Slot Device Expansion Shelf Optional Controller Shelf Part Numbers and Model Descriptions DS-SWXRA-GH DS-SWXRA-GK DS-SWXRA-GN DS-HSZ22-AAShelf Features Controller Shelf EnclosureController Shelf Major Components Shelf Cabinet Installation Shelf Major ComponentsDevice I/O Module Upper Mounting Tab Device Port Connector Lower Host I/O Module Device I/O Module Blower Status LEDsCTR UPS Controller Shelf Power Supplies Shelf CoolingUninterruptable Power Supply UPS Power SupplyConnecting the RA3000 Controller Shelf to a Host System 6-Slot Device Expansion Shelf OptionalHost System Host System SHR-1318 Host System Specifications Controller Shelf Technical SpecificationsShelf Technical Specifications Controller Shelf Power and Physical Specifications RAID Array Controller Controller OverviewRAID Array 3000 Single Controller Block Diagram Controller Features Bridging the Gap Between the Host and Device Expansion ShelfDisk Drives Controller Reset and LED Indicators LED/Reset Switch InterfaceFlexible RAID Set Configuration Controller Front PanelCustom Components Performance EnhancementsEfficient Write and Read Algorithms RAID Levels Supported RAID Levels SupportedDescription RAID Shelf RAID Set RestrictionsRAID 0 Write Diagram of a RAID 1 Write RAID 0+1Diagram of RAID 0+1 Write RAID 0+1 ExampleDiagram of a RAID 4 Write RAID Diagram of a RAID 5 Write System Parameters JbodRedundant Operation Message Passing InitializationFailover Response to Various AC Power Conditions Backup Power ManagementEnvironmental Installation and Maintenance Installation GuidelinesInstalling Shelves in the Cabinet Recommended Single Expansion Shelf Installation SHR-1097 SHR-1098 13 12 11 Shelf Support Mounting Kits and Installation Guides Installing Shelf SupportsRetma Cabinet Shelf Support Parts List Installing Shelf Supports in a Retma Cabinet Square Hole Installing UPS Brackets Retma Cabinet Shelf SupportsUPS Rack-mount Bracket Mounting Hardware List UPS Rack-mount Bracket Assemblies UPS Bracket Retma and Metric Hole Locations Rear Power and Scsi Cable Connection Procedures Scsi Bus Target Addresses and Termination Installation and Maintenance Controller/ Single Device Expansion Shelf Cabling Diagram 10 AC Power Wiring Diagram RAID Array 3000 Controller Shelf 11 Controller/ Two Device Expansion Shelf Cabling Diagram RAID Array 3000 Controller Shelf Installation and Maintenance 12 Controller/ Three Device Expansion Shelf Cabling Diagram Installation and Maintenance RAID Array 3000 Controller Shelf 13 Controller/ Four Device Expansion Shelf Cabling Diagram RAID Array 3000 Controller Shelf Controller Shelf Status LEDs 14 Shelf Status LEDsController LEDs Replacing Components FRU’s15 Controller Shelf Field Replaceable Units Controller Shelf Field Replaceable UnitsReplacing a Host or Device I/O SBB 16 Replacing the Host I/O SBBReplacing a Power Supply SBB Replacing the RAID Controller 17 Removing the Controller from the ShelfReplacing the UPS Replacing a Blower18 Replacing a Blower Assembly Replacing the Controller Memory Cache Modules 19 Controller Cache Modules 21 Remove Installed Simm Modules 22 Install Replacement Modules Second Controller Option IntroductionInstalling the Upgrade Save Existing ConfigurationSaving the Existing Configuration Update Firmware Saved ConfigurationUpdate Firmware Using Serial Interface Shutdown RA3000 Install Two SIMMs into Second Controller Insert Module into Simm ConnectorReplace Existing Controller Remove Controller from Top SlotRestore Configuration Restoring Configuration to New ControllerUpdate Firmware on Second Controller Install Original ControllerConfiguring the RA3000 for the Active Mode of Operation Configuring the Dual Controllers Connecting to Your Dual Controller Storage System Verifying the Controller Operating ParametersRAID Array 3000 Storage Subsystem
Related manuals