Compaq 3000 manual Replacing a Power Supply SBB

Page 82

Chapter 3. Installation and Maintenance

3.6.2 Replacing a Power Supply SBB

CAUTION

When you remove a power supply, the airflow through the shelf is reduced. Always install the re- placement unit immediately to prevent overheat- ing.

You can replace a dc power supply without affecting shelf operation using the following procedure:

1.Remove the ac input power cable from the shelf power supply.

2.Squeeze the mounting tabs to release the unit and pull it out of the shelf.

3.Insert the replacement power supply into the shelf slot, align the guide slots, and then push it in until the SBB tabs lock into place.

4.Connect the input power cable to the power supply ac receptacle.

5.Observe the LEDs on the replacement power supply and ensure that the unit is operating properly.

6.If the shelf power is removed during power supply replacement, the con- troller must place the storage devices on-line sequentially at four-second in- tervals. Make sure the LEDs on both the power supply and the storage de- vices indicate normal operation.

EK–SMCPQ–UG. C01

3–31

Image 82
Contents RAID Array 3000 Controller Shelf Page Japan USA Contents Installation and Maintenance Second Controller OptionFigures Tables Removing the Controller from the ShelfRevision Record About This Guide Associated Documents Associated DocumentsNomenclature Convention RAID Advisory Board Description ConventionsStyle Conventions RAID Array 3000 UsageWho to contact in Europe Support and Services Who to contact in the AmericasWho to contact in Asia Pacific Product Overview Product DescriptionRAID Array 3000 Controller Shelf RAID Array 3000 6-Slot Device Expansion Shelf Optional Controller Shelf Part Numbers and Model Descriptions DS-SWXRA-GH DS-SWXRA-GK DS-SWXRA-GN DS-HSZ22-AAShelf Features Controller Shelf EnclosureController Shelf Major Components Shelf Cabinet Installation Shelf Major ComponentsDevice I/O Module Upper Mounting Tab Device Port Connector Lower Host I/O Module Device I/O Module Blower Status LEDsCTR UPS Controller Shelf Power Supplies Shelf CoolingUninterruptable Power Supply UPS Power SupplyConnecting the RA3000 Controller Shelf to a Host System 6-Slot Device Expansion Shelf OptionalHost System Host System SHR-1318 Host System Specifications Controller Shelf Technical SpecificationsShelf Technical Specifications Controller Shelf Power and Physical Specifications RAID Array Controller Controller OverviewRAID Array 3000 Single Controller Block Diagram Controller Features Bridging the Gap Between the Host and Device Expansion ShelfDisk Drives Controller Reset and LED Indicators LED/Reset Switch InterfaceFlexible RAID Set Configuration Controller Front PanelCustom Components Performance EnhancementsEfficient Write and Read Algorithms RAID Levels Supported RAID Levels SupportedDescription RAID Shelf RAID Set RestrictionsRAID 0 Write Diagram of a RAID 1 Write RAID 0+1Diagram of RAID 0+1 Write RAID 0+1 ExampleDiagram of a RAID 4 Write RAID Diagram of a RAID 5 Write System Parameters JbodRedundant Operation Message Passing InitializationFailover Response to Various AC Power Conditions Backup Power ManagementEnvironmental Installation and Maintenance Installation GuidelinesInstalling Shelves in the Cabinet Recommended Single Expansion Shelf Installation SHR-1097 SHR-1098 13 12 11 Shelf Support Mounting Kits and Installation Guides Installing Shelf SupportsRetma Cabinet Shelf Support Parts List Installing Shelf Supports in a Retma Cabinet Square Hole Installing UPS Brackets Retma Cabinet Shelf SupportsUPS Rack-mount Bracket Mounting Hardware List UPS Rack-mount Bracket Assemblies UPS Bracket Retma and Metric Hole Locations Rear Power and Scsi Cable Connection Procedures Scsi Bus Target Addresses and Termination Installation and Maintenance Controller/ Single Device Expansion Shelf Cabling Diagram 10 AC Power Wiring Diagram RAID Array 3000 Controller Shelf 11 Controller/ Two Device Expansion Shelf Cabling Diagram RAID Array 3000 Controller Shelf Installation and Maintenance 12 Controller/ Three Device Expansion Shelf Cabling Diagram Installation and Maintenance RAID Array 3000 Controller Shelf 13 Controller/ Four Device Expansion Shelf Cabling Diagram RAID Array 3000 Controller Shelf Controller Shelf Status LEDs 14 Shelf Status LEDsController LEDs Replacing Components FRU’s15 Controller Shelf Field Replaceable Units Controller Shelf Field Replaceable UnitsReplacing a Host or Device I/O SBB 16 Replacing the Host I/O SBBReplacing a Power Supply SBB Replacing the RAID Controller 17 Removing the Controller from the ShelfReplacing the UPS Replacing a Blower18 Replacing a Blower Assembly Replacing the Controller Memory Cache Modules 19 Controller Cache Modules 21 Remove Installed Simm Modules 22 Install Replacement Modules Second Controller Option IntroductionInstalling the Upgrade Save Existing ConfigurationSaving the Existing Configuration Update Firmware Saved ConfigurationUpdate Firmware Using Serial Interface Shutdown RA3000 Install Two SIMMs into Second Controller Insert Module into Simm ConnectorReplace Existing Controller Remove Controller from Top SlotRestore Configuration Restoring Configuration to New ControllerUpdate Firmware on Second Controller Install Original ControllerConfiguring the RA3000 for the Active Mode of Operation Configuring the Dual Controllers Connecting to Your Dual Controller Storage System Verifying the Controller Operating ParametersRAID Array 3000 Storage Subsystem
Related manuals
Manual 137 pages 52.02 Kb