Optoma Technology HDBV3100 Assembly of the Base Unit, Installation of the Projector Base Step

Page 27

Installation Guide

HDBV3100, HDBV3090, HDBV3080

5. Assembly of the Base Unit

Step 1:

Locate the base unit and the two base hangers that were set aside. (Refer back to Figure 2-4: Box 2 Detail.)

Step 2:

Carefully lift the bottom of the base unit by lifting the left and right side. Attach the base hangers as shown in

Figure 2-5: Installation of the Projector Base.

(Note the orientation of the base hangers; (S) for towards the front/screen and (M) towards the back/mirror.)

Step 3:

With at least two people, lift the base unit, position it in to the wall below the mirror and align the base hangers directly under the mirror stay arms for later attachment.

For more information, please visit our website at:

Installation Guide

http://www.optomausa.com/BigVizion

 

27

Image 27
Contents Installation Guide HDBV3100, HDBV3090, HDBV3080 BigVizion In-Wall Rear Projection DisplayAbout this Manual FCC Warning Mirror Handling Installation PreparationContents Position and Placement of the BigVizion Section I Preparation for the InstallationWall Preparation Step Preparing the WallBigVizion Wall Opening Diagram. Figure 1100 BigVizion Wall Opening 290 BigVizion Wall Opening 380 BigVizion Wall Opening See -4 Box #1 Detail Step Shipment of Box 1 Master Outer Frame4Box #1 Detail Assembly of the Master Outer Frame 5Installation of the Master Frame Installation of the Master Outer Frame into the Wall Opening 6Installation of the Master Frame into the Wall Opening Section II Installation of the Frame Components Shipment of the Internal Frame Components to the Job SiteUnpacking the Mirror 1Exploded View of the Mirror and the Frame Installation of the Mirror 2Installation of the Mirror Assembly Unpacking of Base Unit and Components Step Locate Box 2. Refer to -3 The Unpacking DiagramStep Refer back to Figure 3The Unpacking Diagram Box 2 Detail Installation of the Projector Base Step Assembly of the Base UnitInstallation of the Base Unit 5Installation of the Projector Base Installation of the Screen Frame See -6 Installation of the Screen 6Installation of the Screen Installation of the Wood Bezel 7Installation of the Wood Bezel Section III Alignment of the Light Engine Alignment Platform Adjustment Procedure1Setting the Gage on 0 Position 2Vertical Keystone Adjustment 3Horizontal Keystone Adjustment 4Skewed Image Adjustment 5Image Shift Vertically Adjustment 6Image Shift Horizontally Adjustment 7Image Sizing Adjustment Cables Appendix a Cable Wiring/ConnectionsConnectors Connectors Instructions System Command Board HD3000 RS-232C Protocol Function List Appendix B Discrete IR/RS-232C CodesFunction Description BasicOriginal Basic Update Appendix C Exploded View of the Product HDBV3100, HDBV3090, HDBV3080 USA