Optoma Technology HDBV3090, HDBV3100, HDBV3080 manual Installation Preparation, Mirror Handling

Page 5

Installation Guide

HDBV3100, HDBV3090, HDBV3080

Installation Preparation

WARNING:

All installations must be performed in accordance with standard utility practice; The National Electric Code, The National Electric Safety Code, The Local Electric Code, and any local city ordinances that may apply to building construction and/or modification to residential structures.

In the event of a conflict regarding any standards governing the installation/construction of the BigVizion system, or any component thereof, the strongest standard shall apply.

MIRROR

HANDLING

MIRROR HANDLING

The mirror is extremely fragile. Exercise extreme caution when moving.

Mirror weight is ~150 lbs.

TYPICAL TOOLS FOR INSTALL Installation requires:

1)Power drill

2)1/2" open-ended wrench and socket set

3)Level

4)Flathead and Philips head screwdriver

5)Utility knife

For more information, please visit our website at:

Installation Guide

http://www.optomausa.com/BigVizion

 



Image 5
Contents Installation Guide HDBV3100, HDBV3090, HDBV3080 BigVizion In-Wall Rear Projection DisplayAbout this Manual FCC Warning Mirror Handling Installation PreparationContents Position and Placement of the BigVizion Section I Preparation for the InstallationWall Preparation Step Preparing the WallBigVizion Wall Opening Diagram. Figure 1100 BigVizion Wall Opening 290 BigVizion Wall Opening 380 BigVizion Wall Opening See -4 Box #1 Detail Step Shipment of Box 1 Master Outer Frame4Box #1 Detail Assembly of the Master Outer Frame 5Installation of the Master Frame Installation of the Master Outer Frame into the Wall Opening 6Installation of the Master Frame into the Wall Opening Unpacking the Mirror Section II Installation of the Frame ComponentsShipment of the Internal Frame Components to the Job Site 1Exploded View of the Mirror and the Frame Installation of the Mirror 2Installation of the Mirror Assembly Unpacking of Base Unit and Components Step Locate Box 2. Refer to -3 The Unpacking DiagramStep Refer back to Figure 3The Unpacking Diagram Box 2 Detail Installation of the Projector Base Step Assembly of the Base UnitInstallation of the Base Unit 5Installation of the Projector Base Installation of the Screen Frame See -6 Installation of the Screen 6Installation of the Screen Installation of the Wood Bezel 7Installation of the Wood Bezel Section III Alignment of the Light Engine Alignment Platform Adjustment Procedure1Setting the Gage on 0 Position 2Vertical Keystone Adjustment 3Horizontal Keystone Adjustment 4Skewed Image Adjustment 5Image Shift Vertically Adjustment 6Image Shift Horizontally Adjustment 7Image Sizing Adjustment Cables Appendix a Cable Wiring/ConnectionsConnectors Connectors Instructions System Command Board HD3000 RS-232C Protocol Function List Appendix B Discrete IR/RS-232C CodesFunction Description BasicOriginal Basic Update Appendix C Exploded View of the Product HDBV3100, HDBV3090, HDBV3080 USA