Optoma Technology HDBV3080, HDBV3100, HDBV3090 manual Instructions

Page 46

Installation Guide

HDBV3100, HDBV3090, HDBV3080

Instructions:

Connectors SC2, SC3, SC7, SC10 and SC11 are connected at the factory. To connect the rest of the cables, follow the procedures below.

NOTE: Cables 3 through 7 each have two different ends and only fit in their proper locations in one orientation.

Do not force any of the cables in if they do not fit. Doing so may damage the cables and/or their respective housings.

1)Connect Cable 1 from the DVI slot SC12 on the system command board to the DVI slot LE2 on the light engine.

2)Connect Cable 2 from the HDMI slot SC1 on the system command board to the HDMI out slot on the HD3000.

3)Connect Cable 3 from the 12V trigger plug SC6 on the system command board to the 12V trigger plug on the HD3000.

4)Connect Cable 4 from the 14-pin plug SC4 on the system command board to the power plug LE1on the light engine.

5)Connect Cable 5 from the fan power plug SC8 on the system command board to the power cable LE6 on the lamp fan.

6)Connect Cable 6 from the fan power plug SC9 on the system command board to the power cable LE3 on the DMD fan.

7)Connect Cable 7 from the thermal switch plug SC5 on the system command board to the thermal switch cable LE5.

8)Connect the ballast cable to the lamp power plug LE4 and screw it down.

The schematics of these connections can be found on the next page.

For more information, please visit our website at:

Installation Guide

http://www.optomausa.com/BigVizion

 

46

Image 46
Contents Installation Guide BigVizion In-Wall Rear Projection Display HDBV3100, HDBV3090, HDBV3080About this Manual FCC Warning Installation Preparation Mirror HandlingContents Section I Preparation for the Installation Position and Placement of the BigVizionPreparing the Wall Wall Preparation StepBigVizion Wall Opening Diagram. Figure 1100 BigVizion Wall Opening 290 BigVizion Wall Opening 380 BigVizion Wall Opening Shipment of Box 1 Master Outer Frame See -4 Box #1 Detail Step4Box #1 Detail Assembly of the Master Outer Frame 5Installation of the Master Frame Installation of the Master Outer Frame into the Wall Opening 6Installation of the Master Frame into the Wall Opening Shipment of the Internal Frame Components to the Job Site Section II Installation of the Frame ComponentsUnpacking the Mirror 1Exploded View of the Mirror and the Frame Installation of the Mirror 2Installation of the Mirror Assembly Step Locate Box 2. Refer to -3 The Unpacking Diagram Unpacking of Base Unit and ComponentsStep Refer back to Figure 3The Unpacking Diagram Box 2 Detail Assembly of the Base Unit Installation of the Projector Base StepInstallation of the Base Unit 5Installation of the Projector Base Installation of the Screen Frame See -6 Installation of the Screen 6Installation of the Screen Installation of the Wood Bezel 7Installation of the Wood Bezel Alignment Platform Adjustment Procedure Section III Alignment of the Light Engine1Setting the Gage on 0 Position 2Vertical Keystone Adjustment 3Horizontal Keystone Adjustment 4Skewed Image Adjustment 5Image Shift Vertically Adjustment 6Image Shift Horizontally Adjustment 7Image Sizing Adjustment Appendix a Cable Wiring/Connections CablesConnectors Connectors Instructions System Command Board Appendix B Discrete IR/RS-232C Codes HD3000 RS-232C Protocol Function ListFunction Description BasicOriginal Basic Update Appendix C Exploded View of the Product HDBV3100, HDBV3090, HDBV3080 USA