2. Preparing the Wall

For new home construction, the roughing stage to the final installation may take several months. The BigVizion packaging has been designed for the master frame (Outer Master Frame) to be installed during the roughing stage. Follow the listed steps for installation:

Wall Preparation:

Step 1:

The location of the installation will be determined by environmental factors such as wall depth, lighting and ideal viewing heights.

The ideal vertical placement of the BigVizion in the wall opening created, as measured from the floor to the sill (bottom of the screen) for seated viewing, is as follows:

Model

Screen Size

Height from seated position

 

 

 

BVHD3100

100"

~ 20.5"

BVHD3090

90"

~ 23"

 

 

 

BVHD3080

80"

~ 25.5"

 

 

 

NOTE: The above are recommendations, the final decision will be determined by the installation professional based on room and environmental factors.

For more information, please visit our website at:

Installation Guide

http://www.optomausa.com/BigVizion

 

Image 8
Contents Installation Guide BigVizion In-Wall Rear Projection Display HDBV3100, HDBV3090, HDBV3080About this Manual FCC Warning Installation Preparation Mirror HandlingContents Section I Preparation for the Installation Position and Placement of the BigVizionPreparing the Wall Wall Preparation StepBigVizion Wall Opening Diagram. Figure 1100 BigVizion Wall Opening 290 BigVizion Wall Opening 380 BigVizion Wall Opening Shipment of Box 1 Master Outer Frame See -4 Box #1 Detail Step4Box #1 Detail Assembly of the Master Outer Frame 5Installation of the Master Frame Installation of the Master Outer Frame into the Wall Opening 6Installation of the Master Frame into the Wall Opening Unpacking the Mirror Section II Installation of the Frame ComponentsShipment of the Internal Frame Components to the Job Site 1Exploded View of the Mirror and the Frame Installation of the Mirror 2Installation of the Mirror Assembly Step Locate Box 2. Refer to -3 The Unpacking Diagram Unpacking of Base Unit and ComponentsStep Refer back to Figure 3The Unpacking Diagram Box 2 Detail Assembly of the Base Unit Installation of the Projector Base StepInstallation of the Base Unit 5Installation of the Projector Base Installation of the Screen Frame See -6 Installation of the Screen 6Installation of the Screen Installation of the Wood Bezel 7Installation of the Wood Bezel Alignment Platform Adjustment Procedure Section III Alignment of the Light Engine1Setting the Gage on 0 Position 2Vertical Keystone Adjustment 3Horizontal Keystone Adjustment 4Skewed Image Adjustment 5Image Shift Vertically Adjustment 6Image Shift Horizontally Adjustment 7Image Sizing Adjustment Appendix a Cable Wiring/Connections CablesConnectors Connectors Instructions System Command Board Appendix B Discrete IR/RS-232C Codes HD3000 RS-232C Protocol Function ListFunction Description BasicOriginal Basic Update Appendix C Exploded View of the Product HDBV3100, HDBV3090, HDBV3080 USA