Shipping Guidelines Follow the steps in Figure
1. Prepare the Switch
• Remove user wiring from terminal module.
• Attach tag to switch that identifies:
– Owner
– Model Number/Serial Number
– Service Required
• Place tagged device in approved
2. Package the Switch
• Place packaged switch in shipping carton.*
• Place 75 to 100 mm (3 to 4 inches) of
• Seal the shipping container securely.
• Mark the shipping container FRAGILE.
3. Ship the Switch to
• Place address label on shipping carton.
• Send carton to Agilent Technologies.
*We recommend that you use the same shipping materials as those used in factory packaging (available from Agilent). For other (commercially available) shipping materials, use a
Figure 1-3. Packaging/Shipping Guidelines
Chapter 1 | General Information 15 |