Starting a Local
Management
Session
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
4.Start a local management session on the unit by performing the next procedure.
The following procedure describes how to connect an
To start a local management session on the unit, perform the following procedure:
1.Connect the
SD |
|
|
|
| x600- |
|
|
|
|
|
|
|
| |
9 |
|
|
|
| READY | 24Ts/XP | Layer 3 | Gigabit |
|
|
| |||
11 | 13 |
|
|
|
|
|
| Ethernet |
|
| ||||
15 |
|
|
|
|
|
|
|
| ||||||
|
| 17 | BUSY | FAULT | SFP |
|
| Switch | ||||||
|
|
|
| 19 |
|
|
| |||||||
|
|
|
|
| 21R | 23R | L | /A | CONS | OLE |
| |||
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
| STATUS |
| |||
|
|
|
|
|
|
|
|
| 21 |
|
|
| ||
10 | 12 | 14 |
|
|
|
|
|
| 22 |
|
| FAULT |
| |
| 16 |
|
|
|
|
| 23 |
|
|
| ||||
|
| 18 |
|
|
|
|
|
|
| |||||
|
|
| 20 |
|
|
|
|
|
| |||||
|
|
|
| 22R |
|
|
|
|
| MASTER |
| |||
|
|
|
|
| 24R |
| 24 |
|
|
| ||||
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
| RPS |
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| PWR | RESET | |
|
|
|
|
|
|
|
|
|
|
|
|
| 1320 |
Figure 30. Connecting the Management Cable to the RJ-45 Terminal Port
on the Switch
2.Connect the other end of the cable to an RS-232 port on a terminal or a personal computer with a terminal emulation program.
3.Configure the terminal or terminal emulation program as follows:
Baud rate: Default is 9600 bps (Range is 9600 to 115200 bps)
Data bits: 8
Parity: None
Stop bits: 1
Flow control: None
Note
The port settings are for a DEC VT100 or ANSI terminal, or an equivalent terminal emulator program.
53