Contents |
|
Power Budgeting | 41 |
Implementation | 42 |
43 | |
AC Power Connector | 44 |
Chapter 2: Installing the Switch | 45 |
Reviewing Safety Precautions | 46 |
Selecting a Site | 49 |
Twisted Pair and Fiber Optic Cable Specifications | 50 |
Twisted Pair Cable Specifications | 50 |
Fiber Optic Cable Specifications | 51 |
Optional Transceiver Cable Specifications | 51 |
Unpacking the Switch | 52 |
Installing the Power Cord Retaining Clip (AC Switches Only) | 53 |
Installing the Switch in a Rack | 54 |
Installing Optional Transceivers | 56 |
Installing a GBIC Transceiver | 56 |
Installing an SFP Transceiver | 57 |
Installing an XFP Transceiver | 59 |
Cabling the Twisted Pair or Fiber Optic Ports | 61 |
Applying AC Power | 62 |
Starting a Local Management Session | 64 |
Warranty Registration | 66 |
Chapter 3: Troubleshooting | 67 |
Power LED is Off | 68 |
Twisted Pair Port Link LED is Off | 69 |
Fiber Optic Port Link LED is Off | 70 |
Transceiver is Installed but the Status is “Not Present” | 71 |
System Fault LED is Blinking | 72 |
System Fault LED is Steadily On | 73 |
Cannot Establish a Local | 74 |
Switch Functions Intermittently | 75 |
Appendix A: Technical Specifications | 77 |
Physical Specifications | 77 |
Environmental Specifications | 78 |
Power Specifications | 79 |
Certifications | 79 |
80 | |
82 | |
83 | |
RPS | 83 |
6