RapidRails Rack Kit Contents
The RapidRails rack kit includes the following items:
• One pair of RapidRails slide assemblies
Installation Tasks
To install a rack kit, perform the following tasks in order:
1.Remove the rack doors.
2.Select a location within the rack.
3.Install the RapidRails slide assemblies.
4.Install the system in the rack.
5.Replace the rack doors.
Remove the rack doors
See the procedures for removing doors in the documentation provided with your rack cabinet.
Caution:
• Due to the size and weight of the rack cabinet doors, never attempt to remove them by yourself.
• Store the doors where they will not injure someone if the doors accidently fall over.
Select a location within the rack
Each InfraStruXure Central Standard or Basic Edition system requires 1 U (44 mm [1.75 inches]) of vertical space in the rack. Each InfraStruXure Central Enterprise Edition system requires 2 U (88 mm [3.5 inches]) of vertical space in the rack.