Route network cables to the InfraStruXure Central server and switch (or hub)

Overhead routing. This section is for InfraStruXure system installations.

1.Ensure that the APC Shielding Partitions and Cable Ladders are installed on the NetShelter enclosures and the InfraStruXure PDUs.

2.Run the Cat-5 network cables (provided) from each APC device to the switch (or hub)

a.Start with the device farthest from the switch (or hub) that uses the longest CAT-5 network cable.

b.Bundle cables together and route the bundles in the data cable troughs along rows and across ladders, if necessary.

3.Connect each APC device’s network cable to any available port on the switch (or hub).

Install and route data cables (alternative routing).

Note: If possible, route data cables overhead, as described in “Overhead routing” on this page. Using APC Shielding Partitions and Cable Ladders with your InfraStruXure system reduces problems related to induced voltages for data transmission.

If you must route data cables under a raised floor:

Do not route data cables inside an InfraStruXure PDU to the floor, either within the power cable conduit or in any other location. Induced voltages from the power cables may interfere with data transmission. Route data cables out the roof of the InfraStruXure PDU and down inside the first NetShelter enclosure to the floor.

Induced voltages can also create problems under the floor when data cables are too close to any power cables. Even if data transmission is successful after the initial installation, later additions to power cabling under the floor for other equipment in your data center can jeopardize the integrity of the data transmission for your InfraStruXure Central system.

8

InfraStruXure Central Installation Manual

Image 12
Contents Installation Manual 동봉된 CD 안에 한국어 매뉴얼이 있습니다 Contents Appendix B Diagnostic Messages Product Description OverviewSafety Rack-mounting safetyEquipment containing a battery Installation Installation InstructionsBefore You Begin RapidRails Rack Kit Contents Installation TasksRemove the rack doors Select a location within the rackInstall the RapidRails slide assemblies Install the system in the rack Set up the Private LAN Communication ConnectionReplace the rack doors Network overviewInstall and route data cables alternative routing Connect the InfraStruXure Central server to your Public LAN Connect the InfraStruXure Central server to your Private LANInitial Configuration Configure the InfraStruXure Central ServerSystem and Web browser prerequisites Enable Remote Monitoring Product Information InfraStruXure Central Front PanelBasic model front Standard model front ItemFunctionEnterprise model front InfraStruXure Central rear panel Basic model rearStandard Model rear Enterprise Model rear Specifications InfraStruXure Central serverAppendix a LED Error Codes Error Code ListingOverview InfraStruXure Central Installation Manual Appendix B Diagnostic Messages Message ListingPower supply voltage is out of acceptable range specified Timer refresh failure Two-Year Factory Warranty Terms of warrantyNon-transferable warranty Exclusions Warranties and PoliciesWarranty claims Life Support PolicyGeneral policy Examples of life-support devicesInfraStruXure Central Installation Manual Page 990-3321-001 06/2008