Rose electronic Professional Series manual Ultraview PRO Installation and Operations Manual

Page 48

Appendix D. Rack mount instructions

The UltraView Pro can be mounted in a rack using the Rackmount kits from Rose Electronics.

The optional rack mount kit includes the following items:

￿Two black anodized mounting brackets.

￿Four 6-32 x 3/8” flat head mounting screws.

To rack mount your UltraView Pro, attach the two rack mounting brackets to your unit with the short flange against the unit using the four screws provided. Secure the mounting brackets to the rack using the appropriate size bolts, nuts and lock washers. Using hardware other than that provided could cause damage to the electronics and/or result in loss of mounting integrity. Do not over tighten the screws used to mount the unit to the mounting brackets.

The following general guidelines should be observed when installing your unit into a rack.

1.The UltraView Pro is designed to work in an ambient temperature of 0ο C to 45ο C (32ο F – 113ο F).

2.Units should be placed (1) rack space apart from each other and from other equipment.

3.Rack vent panels (1 space) should be installed between units to provide adequate air flow to the unit.

4.Keep front and rear doors closed on racks equipped with forced air blowers or fans.

5.Do not block power supply vents or otherwise restrict airflow when rack-mounting this unit.

6.Mechanical loading of the rack should be considered to prevent instability and possible tipping over.

7.Tighten all connectors securely and provide adequate strain relief for all cables.

8.Provide a grounded power source to all units. Pay special attention to overall branch circuit load ratings before connecting equipment to this source. Overloaded circuits are potential fire hazards and can cause equipment failures or poor performance.

42ULTRAVIEW PRO INSTALLATION AND OPERATIONS MANUAL

Image 48
Contents Installation and Operations Manual Page Limited Warranty Copyright  Rose Electronics 1990-2002. All rights reservedFCC/IC STATEMENTS, EU Declaration of Conformity Table of Contents Tables AppendicesIntroduction DisclaimerIntroduction / System overview Features Package contentsSystem overview CompatibilityRose Electronics web site KVM stationCPU connection Cascading UnitsMenu system Models UltraView Pro modelsUltraView Pro models rear MouseCables UltraView Pro CablesUltraView Pro to KVM station cable UltraView Pro to CPU cablesInstallation Installation single unitConnecting the keyboard, video monitor, and mouse Apply power to UltraView ProConnecting the computers Installation Cascading units UltraView Pro to CPUsSlave unit installation Cascading unitsUltraview PRO Installation and Operations Manual Configuration Menus Main configuration menuConfigure system menu Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Configure computer menu USB-PC Configure overlay Configure overlayUltraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Configure security Ultraview PRO Installation and Operations Manual Operation Selecting a computerKeyboard Commands Keyboard commandsType Keyboard command usage Reset to factory defaultsRackmounting Firmware update RS232 PortSerial Port RS232 Ultraview PRO Installation and Operations Manual Good Troubleshooting TroubleshootingUltraview PRO Installation and Operations Manual Service and Maintenance Service InformationMaintenance and Repair Technical SupportSafety SafetySafety and EMC Regulatory Statements Ultraview PRO Installation and Operations Manual Appendices YESKIT-ATRX Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Ultraview PRO Installation and Operations Manual Page Stancliff Road Houston, Texas Phone 281