INSTALLING THE SWITCH
INSTALLING THE SWITCH
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents of the box to be sure you have received the following components:
•EZ Switch 10/100
•Appropriate AC power cable
•Four adhesive foot pads & rackmount kit
•SMC Warranty Registration Card
•This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when choosing a location:
Select a suitable location for the switch:
•It should be accessible for installing, cabling and maintaining the switch.
•The temperature and humidity should be within the ranges listed in the specifications.
•The status LEDs should be clearly visible.
•There should be adequate space (approximately two inches) on all sides for proper air flow.
Make sure
5