Roberts Gorden CTHN-100 5 Burner Tube Installation, 6 Tube Clamp Package Installation, Washer

Models: CTHN-60 CTHN-150 CTHN-175 CTHN-80 CTHN-125 CTHN-40 CTHN-100 CTHN-200

1 48
Download 48 pages 22.1 Kb
Page 25
Image 25
Step 8.5 Burner Tube Installation

SECTION 8: UNITARY LINEAR & U-TUBE HEATER INSTALLATION

Step 8.5 Burner Tube Installation

NOTE:

Tubing requires a downward slope of 1/2" (1.3 cm)

per 20' (6 m) away from burner.

S-hook

Hanger Step 8.6 Tube Clamp Package InstallationWasherManual background

Burner Tube

7' 6" ± 1'

(229 cm ± 25 cm)

Offset mounting hole must be Manual background to the top.

Weld seam must be to the bottom of the tube.

Description

Part Number

Burner Tube

03051XXX

 

 

S-hook

91907302

 

 

Tube/Reflector Hanger

03090100

 

 

Step 8.6 Tube Clamp Package Installation

Description

Part Number

 

 

Tube Clamp Package

01318901

 

 

Tube Clamp

01396801

 

Bolt

Bolt

97113940

Tube Clamp

 

Flat Washer

95211600

 

 

Nut

92113900

Flat

 

 

 

Washer

 

 

 

Nut

 

 

 

(Torque 120 in/lb

 

 

 

13.56 Nm)

 

 

 

 

19

Page 25
Image 25
Roberts Gorden CTHN-100, CTHN-200, CTHN-40, CTHN-125 5 Burner Tube Installation, 6 Tube Clamp Package Installation, Washer