Site Planning Data
Additional Notes
UPS Cabinet
Description
Site Planning Data
Options
System Components
Standard UPS Unit
‡ %ROWðRQýEDWWHU\ýFDELQHWñýIDFWRU\ýFRQQHFWHG
Modes of Operation
HFHVVýPRLVWXUHñýRUýGHEULVï
Safety Precautions
ZRUNLQJýZLWKýWKHý836ï $ $51,1* 7+ý%$775ý,6ý$/$6ý15*,=ïý
UPS Installation
Internal Inspection of the UPS System
Installation Considerations
Unloading and External Inspection
167$//$7,21ý7,3
Batteries
Equipment Location
RQýLWVýFDVWHUýZKHHOVï
$ð$&,ý%$775,6ý&$1ý35617ý$ý5,6.ý2ý,5ý
Electrical Wiring
UPS Wire Size Guidelines
Power & Control Wiring
Battery Wiring
9HULI\ýWKHýIROORZLQJýFRQQHFWLRQVýKDYHýEHHQýPDGHã
Wiring Connections
Wiring Inspection
HUHGýIURPýWKHý836ýRXWSXWôñýSOXVýJURXQGï
Copper Aluminum or Copper-Clad Aluminum
Temp F
#6 350 MCM
10.7
28.9
One Line Drawing Single Input Configuration 200/240V In/Out
One Line Drawing Dual Input Configuration 200/240V In/Out
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Installation
Cabinet Dimensions
Cabinet Dimensions With Transformer Cabinet
Connecting Terminal Details
Connecting Terminal Details With Transformer Cabinet
Battery Option Details 12 Inch Cabinet
Battery Option Details 24 Inch Cabinet
Field Lug Wiring Terminations
Unloading Instructions
Unloading Instructions 24 Inch Battery Cabinet
Battery Times
Control / Display Panel
LCD Display Description
LCD Display
ILJXUDWLRQýLVýRSWLRQDOï
Initial Start-Up
Êï 836ý0HWHUV Éï $FFHSWý6HWWLQJV
\VWHPï 7RýVWDUWýXQLWñýSXVKýWKHý21ýEXWWRQï
See 4.0 Features & Options
Configuration Screen Default Value
Advanced Configuration Screen Default Value
Æï 3URJUDPPDEOHý,QSXWýFRQWDFWV
1HXWUDOï
System Start-Up
Normal Operation
RUýLIýWKHý532ýEXWWRQýLVýSUHVVHGï
Battery Operation
UHVXPHýDQGýEDWWHU\ýUHFKDUJLQJýZLOOýEHJLQï
UHFKDUJHýUDWHñýLQýRUGHUýWRýRSWLPLHýEDWWHU\ýOLIHï
Static Transfer Switch
Bypass Operation
Configuration Menu Tree
Manual Off
Maintenance Bypass
System Shutdown
Automatic Off
Control Switch Locations
Check Messages
User Response to UPS Alarms
Press ‘ON’ To start system Press -- to check
Time Remaining
Load on
Bypass
Alarm Messages
Alarm Message Meaning Corrective Action
Restart after Low Battery
Shutdown
Procedures in 3.0 Operation
Liebert Global Services
Terminal Operation
RS-232 Communication Feature
Introduction
Factory Installed Options
External Battery Cabinets
Field Installable Options
Battery Cabinets
Output Distribution Panel
SiteNet Snmp Simple Network Management Protocol
Communication Options
SiteNet 1 Shutdown Interface Kits
Internal Modem
Input Contact Isolator
Delayed Battery Recharge
Optional DC Ground Fault Alarm
Optional Remote Status Panel
DFFRUGDQFHýZLWKýORFDOýDQGýQDWLRQDOýFRGHýUHTXLUHPHQWVï
Optional Power Supply
Floor Anchors
RS-232 Connections
Output Distribution Panel Board
Routine Maintenance Requirements
Battery Maintenance
Ëï ,ý/&752/7ý&217$&76ý7+ý6.,1ñý$6+ý,7ý2ý ,00,$7/ý,7+ý$75ï
System
Physical Characteristics
Battery