Battery replacement procedure

Refer to the label on the battery drawer.

1.Be sure that the transport screws (A, fig. 1) have

been removed.

2. Remove the front panel of the battery compartment. Use a screw driver or pen as a lever.

3. Remove the two screws that hold the battery drawer.

4.Disconnect the DC connectors. Use a screwdriver as a lever.

5.Remove battery drawer. Be careful, heavy weight!

6. Remove clamp (two screws) and replace the batteries.

7. Reinstall battery clamp, do not pinch or clamp the wires.

8.Slide in the battery drawer.

9. Connect the DC connectors, a small spark is normal. Fasten the two screws.

10. Reinstall the front panel.

fig. 9

OPM_NPE_19X_600_1K5_2GB_V030

11

GE DE NetPro 19” 600-1500: User manual 3.0 (GB)

Image 12
Contents NetPro NetPro Installation IntroductionInstallation Procedure 1000VA model onlyOperation Start-upUse Normal Operation Use Status and Alarm Indications On line normal operation See On battery Battery low end of runtimeRuntime indication fig Use Setup Mode Replace batteryProgrammed shutdown Indicating LED is OffBattery Management Automatic battery testManual battery test Communication RS232 Port figRelay Interface Card option Snmp Interface Card optionOptional Features MaintenanceBattery replacement procedure Remove battery drawer. Be careful, heavy weightTroubleshooting Problem Possible Cause SolutionSpecifications NetPro 19 model 600 1000 1500 Ratings