management if the Master Switch fails. For example:

FTOS> enable

FTOS# configure

FTOS(conf)# stack-unit 0 priority 14

The no form of the stack-unitunit-numberpriority number command reverts the management priority of a stack unit to the default value of 0.

Managing a Stack

Master and Member Switches

You can manage a stack of MXL 10/40GbE Switches as a single entity when connected together. Manage the stack from the CLI through the serial console connection or a remote Telnet session over the OOB management IP address.

When a stack is created, one switch automatically becomes the Master Switch and another switch is elected Standby Master. The Master Switch maintains stack operation with minimal impact in the event of:

Switch failure

Inter-switch stacking link failure

Switch insertion

Switch removal

If the Master Switch goes off line, the Standby Master replaces it as the new master and the switch with the next highest MAC address or priority becomes Standby Master.

Stack Startup

Topology Discovery

When a stack is formed, a topology discovery process builds up a database that contains information about all of the switches in the stack, including the FTOS version, hardware version, management priority, and switch MAC address. Use the CLI (show system command) to view this information.

28

Assembling a Switch Stack

Image 28
Contents Getting Started Guide June 2012 P/N WMDP6 Rev. A00 Contents Assembling a Switch Stack Introduction Product DescriptionInternal Ports Hardware OverviewFront Panel Base Module FlexIOTM Plug-in ModulesThen save the configuration and reload the switch Port Numbering USB Ports USB Ports on Front PanelSystem and Port LEDs Describes system LED conditionsPort LEDs on Modules Installation Site PreparationInstalling and Configuring the Switch Unpacking the SwitchInsert Switch Blade Power On Connect Console Yes Loader CLI Installing the Switch Blade in a PowerEdge M1000e PowerEdge M1000e Front View with Server BladesInstalling and Configuring the Switch Page Invoking the X-Loader and U-Boot CLIs Performing the Initial ConfigurationInitial Configuration Procedure Sample Setup Wizard Session Installing and Configuring the Switch Installing and Configuring the Switch Ftos Assembling a Switch Stack Six Stacked MXL 10/40GbE SwitchesConfiguring and Bringing Up a Stack Save the stacking configuration on the 40GbE ports Ftos enable FTOS# configure FTOSconf# stack-unit 0 priority Managing a StackAuto Stack Number Assignment Splitting 40GbE QSFP+ Ports into 10GbE SFP+ Ports Switch Configuration FCoE Connectivity DCB SupportISCSI Operation Next Steps Chassis Physical Design Technical SpecificationsEnvironmental Parameters Power Requirements Ieee StandardsTechnical Specifications Page W. d e l l . c o m s u p p o r t . d e l l . c o m