Force10 Networks CC-C-BLNK-LC manual Installation, Site Preparation

Page 13

Table 1-3 describes the LED status of a 40GbE QSFP+ port that is split into four 10GbE SFP+ ports using a 4x10G breakout cable.

Ta b l e 1 - 3 . L E D St a t u s o f a 4 0 G b E Q S F P + P o r t w i t h B r e a k o u t C a b l e

Port LED

Color

Meaning

 

 

 

 

Off

All four 10GbE ports on a breakout cable are down.

Link Status

Yellow

At least one of the four 10GbE ports on a breakout

 

 

cable is up.

 

 

 

 

Off

No traffic is being transmitted on any 10GbE port on

Activity

 

the breakout cable.

Blinking

Traffic is being transmitted or received on at least one

 

 

Green

of the 10GbE ports on the breakout cable.

 

 

 

Installation

Site Preparation

Before installing the switch or switches, make sure that the chosen installation location meets the following site requirements:

Clearance — There is adequate front and rear clearance for operator access. Allow clearance for cabling, power connections, and ventilation.

Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.

Ambient Temperature — The ambient switch operating temperature range is 10° to 35ºC (50° to 95ºF).

NOTE: Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above 900 m (2955 ft.).

Relative Humidity — The operating relative humidity is 8% to 85% (non-condensing) with a maximum humidity gradation of 10% per hour.

Hardware Overview

13

Image 13
Contents Getting Started Guide June 2012 P/N WMDP6 Rev. A00 Contents Assembling a Switch Stack Product Description IntroductionInternal Ports Hardware OverviewFront Panel FlexIOTM Plug-in Modules Base ModuleThen save the configuration and reload the switch Port Numbering USB Ports on Front Panel USB PortsDescribes system LED conditions System and Port LEDsPort LEDs on Modules Site Preparation InstallationUnpacking the Switch Installing and Configuring the SwitchInsert Switch Blade Power On Connect Console Yes Loader CLI PowerEdge M1000e Front View with Server Blades Installing the Switch Blade in a PowerEdge M1000eInstalling and Configuring the Switch Page Performing the Initial Configuration Invoking the X-Loader and U-Boot CLIsInitial Configuration Procedure Sample Setup Wizard Session Installing and Configuring the Switch Installing and Configuring the Switch Ftos Six Stacked MXL 10/40GbE Switches Assembling a Switch StackConfiguring and Bringing Up a Stack Save the stacking configuration on the 40GbE ports Managing a Stack Ftos enable FTOS# configure FTOSconf# stack-unit 0 priorityAuto Stack Number Assignment Splitting 40GbE QSFP+ Ports into 10GbE SFP+ Ports Switch Configuration FCoE Connectivity DCB SupportISCSI Operation Next Steps Chassis Physical Design Technical SpecificationsEnvironmental Parameters Ieee Standards Power RequirementsTechnical Specifications Page W. d e l l . c o m s u p p o r t . d e l l . c o m