Unpacking the
Unpacking the C2RPS-POE
To unpack the C2RPS‐POE, proceed as follows:
1.Open the box and remove the packing material protecting the devices.
2.Verify the contents of each carton and compare the contents shipped with those listed in Table 2‐1.
3.Perform a visual inspection of the devices for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page 1‐4 for details.
Table 2-1 Contents of N-POE Chassis Carton
Item | Quantity |
|
|
1 | |
|
|
Rubber Foot | 4 |
|
|
Flathead screw M3x6 | 6 |
|
|
Rack mount bracket | 1 |
|
|
USA, NEMA Power Cord | 1 |
|
|
Installation guide | 1 |
|
|
Release Notes | 1 |
|
|
Installing the C2RPS-POE on a Flat Surface
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive electronic equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones de seguridad para evitar descargas de electricidad estática.
When installing the switch on a flat surface, the installation of the rubber feet is recommended to prevent the C2RPS‐POE from sliding on a flat surface. Installing the rubber feet is optional if you are installing the C2RPS‐POE in a rack. To install the rubber feet, proceed to Installing the Rubber Feet instructions below. For instructions to rack mount the switch, proceed to “Rack Mounting the C2RPS‐POE” on page 2‐5.