Installing the C2RPS-POE on a Flat Surface

Guidelines for Installation

Locate the C2RPS‐POE within 152 cm (5 ft) of its power source and on a surface as shown in Figure 2‐2.

Caution: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Do not connect the switch to the AC power source until instructed to do so later in the installation process

Precaución: Para asegurar una buena ventilación y evitar que el sistema se sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y a la parte posterior del aparato..

No conecte la fuente del poder a la fuente primaria hasta que no se le indique.

If the switch is being installed as a standalone switch, proceed to Connecting

C2RPS‐POE Cable and AC Power Cord” on page 2‐7 for power connection instructions.

Figure 2-2 Area Guidelines for C2RPS-POE Installation on Flat Surface

À

 

 

 

C2RPS-POE

Á

 

 

 

 

 

Ã

 

 

 

 

 

 

Â

 

1

Approximately 152 cm (5 ft) from power source

3

49.5 cm (19.5 in.) for proper ventilation

2

4.45 cm (1.75 in.) per C2RPS-POE (Vertical

4

21.5 cm (8.5 in.) for proper ventilation

 

clearance depends on number of devices

 

 

 

 

stacked.)

 

 

 

2-4 Installation

Image 24
Contents SecureStack C2 PoE Redundant Power Supply Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Declaration of Conformity Enterasys Networks, Inc Firmware License Agreement Page Vii Viii Contents Tables Using This Guide About this GuideStructure of This Guide Using the SecureStack C2 Manual Set Conventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xiv About this Guide Introduction For information about Refer toPower Classifications and Deployment C2RPS-POE OverviewC2RPS-POE Status LED Example of a C2RPS-POE Power Configuration Getting Help Support@enterasys.comInstallation Required ToolsInstalling the C2RPS-POE on a Flat Surface Contents of N-POE Chassis Carton QuantityUnpacking the C2RPS-POE Installing the Rubber Feet Guidelines for Installation Guidelines for Rackmount Installation Rack Mounting the C2RPS-POEAttaching Brackets and Installing in Rack Connecting C2RPS-POE Cable and AC Power Cord C2RPS-POE Status LED Indications and Recommended ActionsColor State Recommended Action C2RPS-POE Cable C2RPS-POE Cable and AC Power Cord Connections Connecting C2RPS-POE Cable and AC Power Cord Installation Specifications C2RPS-POE SpecificationsTable A-1 C2RPS-POE Specifications Electrical C2RPS-POE Redundant Power Supply Output Connector Table A-1 C2RPS-POE Specifications PhysicalEnvironmental Compliance Standards Table A-3 Compliance StandardsCompliance Standards Specifications