Installation
Electrical Hazard: Only qualified personnel should perform installation procedures.
Riesgo Electrico: Solamente personal calificado debe realizar procedimientos de instalacion.
Elektrischer Gefahrenhinweis: Installationen sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden.
This chapter provides instructions to install all the components of an RPS.
To correctly install an RPS, follow the order of information listed below.
For information about... | Refer to page... |
|
|
Required Tools | |
|
|
Unpacking Chassis and Power Supply Module(s) | |
|
|
Installing | |
|
|
Installing | |
|
|
Connecting the PSM Cables and AC Power Cords | |
|
|
Required Tools
A flat‐blade screwdriver is required to install the C2RPS‐CHAS2 and C2RPS‐PSMs.
Unpacking Chassis and Power Supply Module(s)
The C2RPS‐CHAS2 and each C2RPS‐PSM are shipped separately. To unpack these devices proceed as follows:
1.Open the box and remove the packing material protecting the devices.
2.Verify the contents of each carton and compare the contents shipped with those listed in Table 2‐1 and Table 2‐2.
SecureStack C2 Installation Guide