Installing the Rubber Feet | |
Installing the Chassis into a Rack | |
Installing the Chassis on the Rack Shelf | |
Installing the Chassis Directly to the Rack | |
Attaching the Electrostatic Discharge Wrist Strap | |
Powering Up a Enterasys Matrix N1 Chassis | |
Cooling Fans |
Chapter 4: NAC Controller PEP Installation
Required Tools | |
Unpacking the NAC Controller PEP | |
Installing Optional | |
Installing NAC Controller PEP into the Matrix N1 Chassis | |
Preparation | |
Installation | |
Connecting to the Network | |
Connecting UTP Cables to the | |
Connecting | |
Connecting to COM Port for Local Management | |
What Is Needed | |
Connecting to an IBM PC or Compatible Device | |
Connecting to a VT Series Terminal | |
Connecting to a Modem | |
Adapter Wiring and Signal Assignments | |
Completing the Installation |
Chapter 5: Troubleshooting
Using LANVIEW | |
About the Management (MGMT) LED | |
Viewing the Receive and Transmit Activity | |
Troubleshooting Checklist | |
Overview of the NAC Controller PEP Shutdown Procedure | |
Recommended Shutdown Procedure | |
Last Resort Shutdown Procedure |
Chapter 6: Initializing the NAC Controller
Overview | |
General Management Considerations | |
Preparation for NAC Controller Initialization | |
The NAC Controller Initialization Procedure | |
The NAC Controller Policy Configuration | |
Setup the VLAN Configurations | |
NAC Controllers Require Separate Domains | |
Modifying NAC Controllers Preconfigured Policy | |
Adding Assessment Classification Rules | |
Modifying the Downstream Default Policy |
Appendix A: Specifications and Regulatory Compliance
7C111 Chassis Specifications and Regulatory Compliance | |
Physical Specifications | |
7C111 Chassis | |
Power Supply | |
Environmental Requirements |
x