Enterasys Networks
7S4280-19-SYS, 2S4082-25-SYS
manual
Troubleshooting
Specs
Install
Connecting to the Network
Configuration Guidelines
Lanview Diagnostic LEDs
Mini-GBIC with LC Connector
Recommended Shutdown Procedure
Parameter Setting
How to
Page 34
NAC Controller PEP Network Requirements
2-6
Installation Requirements and Guidelines
Page 33
Page 35
Image 34
Page 33
Page 35
Contents
Enterasys
Page
Page
Regulatory Compliance Information
Electromagnetic Compatibility EMC
Supplement to Product Instructions
Vcci Notice
Enterasys NETWORKS, INC. Firmware License Agreement
Vii
Viii
Contents
Appendix a Specifications and Regulatory Compliance
NAC Controller PEP Installation
Troubleshooting
Initializing the NAC Controller
Index
Figures
Tables
MGBIC-08
Xiv
About This Guide
How to Use This Guide
Who Should Use This Guide
Related Documents
For Refer to
Typographical Conventions
Commonly Used Acronyms
Getting Help
Introduction
Overview
N1-7C111 Chassis
NAC Controller PEP
Overview
2S4082-25 NAC Controller PEP
2S4082-25 NAC Controller PEP
7S4280-19 NAC Controller PEP
7S4280-19 NAC Controller PEP
Power Supply Status Through System Management
Redundant Power Supplies
Power Supply Lanview LEDs
Auto-Ranging Power Supplies
Standards Compatibility
Lanview Diagnostic LEDs
Secure Networks Policy Support
Standalone or Rack Mountable Chassis
Lanview Diagnostic LEDs Introduction
Installation Requirements and Guidelines
Site Guidelines
Power Supply PS LED Status Definitions
Configuration Guidelines
Power Supply LEDs
Lanview LEDs
Fan LED States and Definitions
NAC Controller PEP Network Requirements
Fan LED
LED Color Status
100BASE-TX Network
Link Aggregation
10BASE-T Network
1000BASE-T Network
1000BASE-SX/LX/ELX Network
Page
Enterasys Matrix N1 Chassis Setup
Unpacking the Enterasys Matrix N1 Chassis
Order of Installation
Setting Up the Enterasys Matrix N1 Chassis
Installing the Chassis on a Flat Surface
Quantity
Installing the Rubber Feet
Installing the Chassis into a Rack
Installing the Chassis on the Rack Shelf
Installing the Chassis Directly to the Rack
Attaching the Electrostatic Discharge Wrist Strap
Powering Up a Enterasys Matrix N1 Chassis
ESD Grounding Receptacle
Connecting the 15-Amp AC Power Cords
Cooling Fans
Unpacking the NAC Controller PEP
NAC Controller PEP Installation
Required Tools
Important Notice
Installing Optional Mini-GBICs
Contents of Module Carton Quantity
Installation
Mini-GBIC with LC Connector
Installing NAC Controller PEP into the Matrix N1 Chassis
Removing the Mini-GBIC
Installation
Preparation
N1 Chassis slot Metal back panel FTM2 backplane connectors
Connecting to the Network
Connecting UTP Cables to the 2S4082-25
NAC Controller PEP card
Connecting a Twisted Pair Segment to the NAC Controller PEP
RJ45 connector RJ45 port connector port Group Select button
RX+
TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4
Connecting Fiber-Optic Cables to Mini-GBICs
10 Cable Connection to MT-RJ Fiber-Optic Connectors
11 Cable Connection to LC Fiber-Optic Connectors
Connecting to an IBM PC or Compatible Device
Connecting to COM Port for Local Management
What Is Needed
Parameter Setting
Connecting to a VT Series Terminal
12 Connecting an IBM PC or Compatible
Connecting to a Modem
13 Connecting a VT Series Terminal
COM Port Adapter Wiring and Signal Diagram
Adapter Wiring and Signal Assignments
RJ45
Modem Port Adapter Wiring and Signal Diagram
Completing the Installation
VT Series Port Adapter Wiring and Signal Diagram
RJ45 DB25
First-Time Log-In Using a Console Port Connection
15 Matrix DFE Startup Screen Example N7 Chassis
About the Management Mgmt LED
Troubleshooting
Using Lanview
Viewing the Receive and Transmit Activity
Lanview LEDs for the 2S4082-25
Lanview LEDs for the 7S4280-19
Color State Recommended Action
Lanview LEDs
Alternating 67% on, 33% off
Troubleshooting Checklist
Series Configuration Guide for proper setup
Troubleshooting Checklist
Problem Possible Cause Recommended Action
Overview of the NAC Controller PEP Shutdown Procedure
OFFLINE/RESET Switch for the 2S4082-25
Recommended Shutdown Procedure
Last Resort Shutdown Procedure
Page
Initializing the NAC Controller
NAC Controller Ports
General Management Considerations
Layer 3 NAC Controller Positioning
Layer 2 In-Band Management Topology
Layer 2 Out-Of-Band Management Topology
Preparation for NAC Controller Initialization
Layer 3 Out-Of-Band Management
NAC Controller Initialization Procedure
Choose NAC Controller Installation Type
Enter the Management Vlan ID
NAC Controller Initialization Procedure
12 Setup NAC Controller PEP Networking
13 Enter NetSight Server IP Address
16 Configure System Date and Time
17 Set the System Date
19 Select the UTC/Local Hardware Clock Setting
21 Enable an Snmp Daemon
Setup the Vlan Configurations
NAC Controller Policy Configuration
NAC Controllers Require Separate Domains
24 Determining NAC Controller Mode of Operation
Modifying NAC Controllers Preconfigured Policy
25 Import From Device Wizard
26 Import From Device Wizard
28 Services Screen
Adding Assessment Classification Rules
Modifying the Downstream Default Policy
Page
Physical Specifications
Specifications and Regulatory Compliance
7C111 Chassis Specifications and Regulatory Compliance
Table A-1 Chassis Specifications Physical
Environmental Requirements
Power Supply
Regulatory Requirements
External Power Supply
NAC Controller Engine Interface Specifications
Table A-5 NAC Controller Engine Specifications Ports
Processor/Memory
NAC Controller Engine COM Port Pinout Assignments
Table A-5 NAC Controller Engine Specifications
Table A-6 COM Port Pin Assignments Signal Name Input/Output
Environmental
Ports
NAC Controller PEP 2S4082-25 Module Specifications
Table A-7 Specifications for 2S4082-25
Processors/Memory
Table A-9 Specifications
NAC Controller PEP 7S4280-19 Specifications
Table A-8 COM Port Pin Assignments Signal Name Input/Output
2S4082-25 COM Port Pinout Assignments
Table A-10 Mini-GBIC Input/Output Port Specifications
Mini-GBIC Input/Output Specifications
7S4280-19 COM Port Pinout Assignments
MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX
Gigabit Ethernet Specifications
MGBIC-LC03 Specifications 1000BASE-SX
MGBIC-LC09 Specifications 1000BASE-LX
MGBIC-08 Specifications 1000BASE-ELX
Regulatory Compliance
MGBIC-02 Specifications 1000BASE-T
Table A-20 MGBIC-02 / Specifications
Table A-21 Compliance Standards
Mode Switch Bank Settings Optional Installations
Setting the Mode Switches
Memory Locations and Replacement Procedures
Location of Memory Modules
Connector fingers
Flash Dimm Replacement Procedure
Connector arms
Flash Dimm
Installing the Dimm
Figure B-4 Installing the Dimm
Connector contacts
Dram Simm Replacement Procedure
Installing the Dram Simm
Removing the Dram Simm
Dram Simm Connector arms Connector contacts
Dram Simm alignment notches
Index
Numerics
Index-2
Related pages
Media troubleshooting for Blackberry 8707 Series
Specifications for Gefen GTV-HDMI-2-COMPSVIDS
Numeric error codes for Lenovo N200
Plumbing Diagram for Holland XL-AR452
ΦHow to Use Defrosting for Zanussi ZBM 879
Preinstalled Software for Yamaha Laptop PC
Replacement Parts Illustrations and Parts Lists for 3M 10500
Language Code List for Toshiba SD-K530SU
Document feeder/scanner glass cleaning for Panasonic KX-FP145AL
Cleaning The CH4000 for Psion Teklogix CH4000
Using the Info button Now & Next guide for Samsung LT28D310EX/XE
How can I fix my Samsung PN43E450 TV if it won't show captions?
Learn more
Top
Page
Image
Contents