Enterasys Networks 2S4082-25-SYS, 7S4280-19-SYS NAC Controller PEP Installation, Required Tools

Page 41

4

NAC Controller PEP Installation

Electrical Hazard: Only qualified personnel should perform installation procedures.

Riesgo Electrico: Solamente personal calificado debe realizar procedimientos de instalacion.

Elektrischer Gefahrenhinweis: Installationen sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden.

Important Notice

Read the Release Notes shipped with the NAC Controller PEP to check for any exceptions to the supported features and operation documented in this guide.

This chapter provides the instructions to install the NAC Controller PEPs 2S4082‐25 and 7S4280‐19 and the Mini‐GBICs interface modules.

Follow the order of the sections listed below to correctly install the NAC Controller PEP into the chassis.

For information about...

Refer to page...

 

 

Required Tools

4-1

 

 

Unpacking the NAC Controller PEP

4-1

 

 

Installing Optional Mini-GBICs

4-2

 

 

Installing NAC Controller PEP into the Matrix N1 Chassis

4-5

 

 

Connecting to the Network

4-7

 

 

Connecting to COM Port for Local Management

4-14

 

 

Completing the Installation

4-18

 

 

Required Tools

Tools needed to install the NAC Controller PEP and options include:

Phillips screwdriver

Flat blade screwdriver

Unpacking the NAC Controller PEP

Unpack the NAC Controller PEP as follows:

1.Open the box and remove the packing material protecting the module.

Enterasys NAC Controller Hardware Installation Guide 4-1

Image 41
Contents Enterasys Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Troubleshooting NAC Controller PEP InstallationAppendix a Specifications and Regulatory Compliance Initializing the NAC ControllerFigures IndexTables MGBIC-08 Xiv Who Should Use This Guide How to Use This GuideAbout This Guide For Refer to Related DocumentsCommonly Used Acronyms Typographical ConventionsGetting Help Overview IntroductionNAC Controller PEP N1-7C111 ChassisOverview 2S4082-25 NAC Controller PEP 2S4082-25 NAC Controller PEP7S4280-19 NAC Controller PEP 7S4280-19 NAC Controller PEPPower Supply Lanview LEDs Redundant Power SuppliesPower Supply Status Through System Management Auto-Ranging Power SuppliesSecure Networks Policy Support Lanview Diagnostic LEDsStandards Compatibility Standalone or Rack Mountable ChassisLanview Diagnostic LEDs Introduction Site Guidelines Installation Requirements and GuidelinesPower Supply LEDs Configuration GuidelinesPower Supply PS LED Status Definitions Lanview LEDsFan LED NAC Controller PEP Network RequirementsFan LED States and Definitions LED Color Status10BASE-T Network Link Aggregation100BASE-TX Network 1000BASE-T Network1000BASE-SX/LX/ELX Network Page Unpacking the Enterasys Matrix N1 Chassis Enterasys Matrix N1 Chassis SetupInstalling the Chassis on a Flat Surface Setting Up the Enterasys Matrix N1 ChassisOrder of Installation QuantityInstalling the Chassis on the Rack Shelf Installing the Chassis into a RackInstalling the Rubber Feet Attaching the Electrostatic Discharge Wrist Strap Installing the Chassis Directly to the RackESD Grounding Receptacle Powering Up a Enterasys Matrix N1 ChassisCooling Fans Connecting the 15-Amp AC Power CordsRequired Tools NAC Controller PEP InstallationUnpacking the NAC Controller PEP Important NoticeContents of Module Carton Quantity Installing Optional Mini-GBICsInstallation Mini-GBIC with LC Connector Removing the Mini-GBIC Installing NAC Controller PEP into the Matrix N1 ChassisPreparation InstallationConnecting UTP Cables to the 2S4082-25 Connecting to the NetworkN1 Chassis slot Metal back panel FTM2 backplane connectors NAC Controller PEP cardRJ45 connector RJ45 port connector port Group Select button Connecting a Twisted Pair Segment to the NAC Controller PEPRX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to Mini-GBICs 10 Cable Connection to MT-RJ Fiber-Optic Connectors 11 Cable Connection to LC Fiber-Optic Connectors What Is Needed Connecting to COM Port for Local ManagementConnecting to an IBM PC or Compatible Device Parameter Setting12 Connecting an IBM PC or Compatible Connecting to a VT Series Terminal13 Connecting a VT Series Terminal Connecting to a ModemRJ45 Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram VT Series Port Adapter Wiring and Signal Diagram Completing the InstallationModem Port Adapter Wiring and Signal Diagram RJ45 DB25First-Time Log-In Using a Console Port Connection 15 Matrix DFE Startup Screen Example N7 Chassis Using Lanview TroubleshootingAbout the Management Mgmt LED Viewing the Receive and Transmit ActivityLanview LEDs for the 7S4280-19 Lanview LEDs for the 2S4082-25Alternating 67% on, 33% off Lanview LEDsColor State Recommended Action Series Configuration Guide for proper setup Troubleshooting ChecklistProblem Possible Cause Recommended Action Troubleshooting ChecklistOFFLINE/RESET Switch for the 2S4082-25 Overview of the NAC Controller PEP Shutdown ProcedureLast Resort Shutdown Procedure Recommended Shutdown ProcedurePage Initializing the NAC Controller NAC Controller Ports Layer 3 NAC Controller Positioning General Management ConsiderationsLayer 2 In-Band Management Topology Layer 2 Out-Of-Band Management Topology Layer 3 Out-Of-Band Management Preparation for NAC Controller InitializationChoose NAC Controller Installation Type NAC Controller Initialization ProcedureEnter the Management Vlan ID NAC Controller Initialization Procedure 12 Setup NAC Controller PEP Networking 13 Enter NetSight Server IP Address 16 Configure System Date and Time 17 Set the System Date 19 Select the UTC/Local Hardware Clock Setting 21 Enable an Snmp Daemon NAC Controllers Require Separate Domains NAC Controller Policy ConfigurationSetup the Vlan Configurations 24 Determining NAC Controller Mode of Operation 25 Import From Device Wizard Modifying NAC Controllers Preconfigured Policy26 Import From Device Wizard Adding Assessment Classification Rules 28 Services ScreenModifying the Downstream Default Policy Page 7C111 Chassis Specifications and Regulatory Compliance Specifications and Regulatory CompliancePhysical Specifications Table A-1 Chassis Specifications PhysicalRegulatory Requirements Power SupplyEnvironmental Requirements Table A-5 NAC Controller Engine Specifications Ports NAC Controller Engine Interface SpecificationsExternal Power Supply Processor/MemoryTable A-6 COM Port Pin Assignments Signal Name Input/Output Table A-5 NAC Controller Engine SpecificationsNAC Controller Engine COM Port Pinout Assignments EnvironmentalTable A-7 Specifications for 2S4082-25 NAC Controller PEP 2S4082-25 Module SpecificationsPorts Processors/MemoryTable A-8 COM Port Pin Assignments Signal Name Input/Output NAC Controller PEP 7S4280-19 SpecificationsTable A-9 Specifications 2S4082-25 COM Port Pinout Assignments7S4280-19 COM Port Pinout Assignments Mini-GBIC Input/Output SpecificationsTable A-10 Mini-GBIC Input/Output Port Specifications MGBIC-LC03 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-08 Specifications 1000BASE-ELX MGBIC-LC09 Specifications 1000BASE-LXTable A-20 MGBIC-02 / Specifications MGBIC-02 Specifications 1000BASE-TRegulatory Compliance Table A-21 Compliance StandardsSetting the Mode Switches Mode Switch Bank Settings Optional InstallationsLocation of Memory Modules Memory Locations and Replacement ProceduresConnector arms Flash Dimm Replacement ProcedureConnector fingers Flash DimmFigure B-4 Installing the Dimm Installing the DimmInstalling the Dram Simm Dram Simm Replacement ProcedureConnector contacts Removing the Dram SimmDram Simm alignment notches Dram Simm Connector arms Connector contactsNumerics IndexIndex-2