Enterasys Networks 7S4280-19-SYS, 2S4082-25-SYS manual Installing Optional Mini-GBICs

Page 42

Installing Optional Mini-GBICs

2.Verify the contents of the carton as listed in Table 4‐1.

Table 4-1 Contents of Module Carton

Item

Quantity

 

 

NAC Controller PEP (2S4082-25 or 7S4280-19)

1

 

 

Customer Release Notes

1

 

 

3.Remove the tape seal on the non‐conductive bag to remove the module.

4.Perform a visual inspection of the module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page xviii for details.

Installing Optional Mini-GBICs

This section describes how to install a Mini‐GBIC in any of the 7S4280‐19 front panel ports (1‐18 + 1‐2 on the NAC Controller Engine) and 2S4082‐25 front panel ports (1‐2 on the

NAC Controller Engine). For a list of supported Mini‐GBICs and their specifications, refer to “Mini‐GBIC Input/Output Specifications” on page A‐7.

Warning: Fiber-optic Mini-GBICs use Class 1 lasers. Do not use optical instruments to view the laser output. The use of optical instruments to view laser output increases eye hazard. When viewing the output optical port, power must be removed from the network adapter.

Advertencia: Los Mini-GBICS de fibra optica usan lasers de clase 1. No se debe usar instrumentos opticos para ver la potencia laser El uso de los instrumentos opticos para ver la potencia laser incrementa el riesgo a los ojos. Cuando vean el puerto de la potencia optica, la corriente debe ser removida del adaptador de la red.

Warnhinweis: Mini-GBICs mit Fiber-Optik Technologie benutzen Laser der Klasse 1. Benutzen sie keinesfalls optische Hilfsmittel, um die Funktion des Lasers zu überprüfen. Solche Hilfsmittel erhöhen die Gefahr von Sehschäden. Wenn sie den optischen Port überprüfen möchten stellen Sie sicher, dass die Komponente von der Spannungsversorgung getrennt ist.

Caution: Carefully follow the instructions in this manual to avoid damaging the Mini-GBIC and NAC Controller PEP.

The Mini-GBIC and NAC Controller PEP are sensitive to static discharges. Use an antistatic wrist strap and observe all static precautions during this procedure. Failure to do so could result in damage to the Mini-GBIC and NAC Controller PEP. Always leave the Mini-GBIC in the antistatic bag or an equivalent antistatic container when not installed.

Precaución: Siga las instrucciones del manual para no dañar el Mini- GBIC, NAC Controller PEP engine ni el módulo DFE, puesto que son muy sensible a las descargas de electricidad estática.

Utilice la pulsera antiestática y tome todas las precauciones necesarias durante este procedimiento. Si no lo hace, podría dañar el Mini- GBIC, NAC Controller PEP engine o el módulo DFE. Mientras no esté instalado, mantenga el Mini- GBIC en su bolsa antiestática o en cualquier otro recipiente antiestático.

Preparation

Before installing the Mini‐GBIC, proceed as follows:

1.Attach the antistatic wrist strap (refer to the instructions in the antistatic wrist strap package) before removing the Mini‐GBIC from the antistatic packaging.

2.Remove the Mini‐GBIC from the packaging.

4-2 NAC Controller PEP Installation

Image 42
Contents Enterasys Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Appendix a Specifications and Regulatory Compliance NAC Controller PEP InstallationTroubleshooting Initializing the NAC ControllerIndex FiguresTables MGBIC-08 Xiv How to Use This Guide About This GuideWho Should Use This Guide Related Documents For Refer toTypographical Conventions Commonly Used AcronymsGetting Help Introduction OverviewN1-7C111 Chassis NAC Controller PEPOverview 2S4082-25 NAC Controller PEP 2S4082-25 NAC Controller PEP7S4280-19 NAC Controller PEP 7S4280-19 NAC Controller PEPPower Supply Status Through System Management Redundant Power SuppliesPower Supply Lanview LEDs Auto-Ranging Power SuppliesStandards Compatibility Lanview Diagnostic LEDsSecure Networks Policy Support Standalone or Rack Mountable ChassisLanview Diagnostic LEDs Introduction Installation Requirements and Guidelines Site GuidelinesPower Supply PS LED Status Definitions Configuration GuidelinesPower Supply LEDs Lanview LEDsFan LED States and Definitions NAC Controller PEP Network RequirementsFan LED LED Color Status100BASE-TX Network Link Aggregation10BASE-T Network 1000BASE-T Network1000BASE-SX/LX/ELX Network Page Enterasys Matrix N1 Chassis Setup Unpacking the Enterasys Matrix N1 ChassisOrder of Installation Setting Up the Enterasys Matrix N1 ChassisInstalling the Chassis on a Flat Surface QuantityInstalling the Chassis into a Rack Installing the Rubber FeetInstalling the Chassis on the Rack Shelf Installing the Chassis Directly to the Rack Attaching the Electrostatic Discharge Wrist StrapPowering Up a Enterasys Matrix N1 Chassis ESD Grounding ReceptacleConnecting the 15-Amp AC Power Cords Cooling FansUnpacking the NAC Controller PEP NAC Controller PEP InstallationRequired Tools Important NoticeInstalling Optional Mini-GBICs Contents of Module Carton QuantityInstallation Mini-GBIC with LC Connector Installing NAC Controller PEP into the Matrix N1 Chassis Removing the Mini-GBICInstallation PreparationN1 Chassis slot Metal back panel FTM2 backplane connectors Connecting to the NetworkConnecting UTP Cables to the 2S4082-25 NAC Controller PEP cardConnecting a Twisted Pair Segment to the NAC Controller PEP RJ45 connector RJ45 port connector port Group Select buttonRX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to Mini-GBICs 10 Cable Connection to MT-RJ Fiber-Optic Connectors 11 Cable Connection to LC Fiber-Optic Connectors Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Parameter SettingConnecting to a VT Series Terminal 12 Connecting an IBM PC or CompatibleConnecting to a Modem 13 Connecting a VT Series TerminalAdapter Wiring and Signal Assignments COM Port Adapter Wiring and Signal DiagramRJ45 Modem Port Adapter Wiring and Signal Diagram Completing the InstallationVT Series Port Adapter Wiring and Signal Diagram RJ45 DB25First-Time Log-In Using a Console Port Connection 15 Matrix DFE Startup Screen Example N7 Chassis About the Management Mgmt LED TroubleshootingUsing Lanview Viewing the Receive and Transmit ActivityLanview LEDs for the 2S4082-25 Lanview LEDs for the 7S4280-19Lanview LEDs Color State Recommended ActionAlternating 67% on, 33% off Troubleshooting Checklist Series Configuration Guide for proper setupTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of the NAC Controller PEP Shutdown Procedure OFFLINE/RESET Switch for the 2S4082-25Recommended Shutdown Procedure Last Resort Shutdown ProcedurePage Initializing the NAC Controller NAC Controller Ports General Management Considerations Layer 3 NAC Controller PositioningLayer 2 In-Band Management Topology Layer 2 Out-Of-Band Management Topology Preparation for NAC Controller Initialization Layer 3 Out-Of-Band ManagementNAC Controller Initialization Procedure Choose NAC Controller Installation TypeEnter the Management Vlan ID NAC Controller Initialization Procedure 12 Setup NAC Controller PEP Networking 13 Enter NetSight Server IP Address 16 Configure System Date and Time 17 Set the System Date 19 Select the UTC/Local Hardware Clock Setting 21 Enable an Snmp Daemon NAC Controller Policy Configuration Setup the Vlan ConfigurationsNAC Controllers Require Separate Domains 24 Determining NAC Controller Mode of Operation Modifying NAC Controllers Preconfigured Policy 25 Import From Device Wizard26 Import From Device Wizard 28 Services Screen Adding Assessment Classification RulesModifying the Downstream Default Policy Page Physical Specifications Specifications and Regulatory Compliance7C111 Chassis Specifications and Regulatory Compliance Table A-1 Chassis Specifications PhysicalPower Supply Environmental RequirementsRegulatory Requirements External Power Supply NAC Controller Engine Interface SpecificationsTable A-5 NAC Controller Engine Specifications Ports Processor/MemoryNAC Controller Engine COM Port Pinout Assignments Table A-5 NAC Controller Engine SpecificationsTable A-6 COM Port Pin Assignments Signal Name Input/Output EnvironmentalPorts NAC Controller PEP 2S4082-25 Module SpecificationsTable A-7 Specifications for 2S4082-25 Processors/MemoryTable A-9 Specifications NAC Controller PEP 7S4280-19 SpecificationsTable A-8 COM Port Pin Assignments Signal Name Input/Output 2S4082-25 COM Port Pinout AssignmentsMini-GBIC Input/Output Specifications Table A-10 Mini-GBIC Input/Output Port Specifications7S4280-19 COM Port Pinout Assignments Gigabit Ethernet Specifications MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXMGBIC-LC03 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELXRegulatory Compliance MGBIC-02 Specifications 1000BASE-TTable A-20 MGBIC-02 / Specifications Table A-21 Compliance StandardsMode Switch Bank Settings Optional Installations Setting the Mode SwitchesMemory Locations and Replacement Procedures Location of Memory ModulesConnector fingers Flash Dimm Replacement ProcedureConnector arms Flash DimmInstalling the Dimm Figure B-4 Installing the DimmConnector contacts Dram Simm Replacement ProcedureInstalling the Dram Simm Removing the Dram SimmDram Simm Connector arms Connector contacts Dram Simm alignment notchesIndex NumericsIndex-2