Enterasys Networks 7S4280-19-SYS, 2S4082-25-SYS Modifying NAC Controllers Preconfigured Policy

Page 86

The NAC Controller Policy Configuration

Modifying NAC Controllers Preconfigured Policy

NAC Controllers are shipped with a default policy configuration already configured on the device. To modify this default policy configuration, you must create a domain for the NAC Controller as discussed in section “NAC Controllers Require Separate Domains” on page 6‐16, assign the NAC Controller to the domain, then import the policy configuration from the device into Policy Manager. You can then modify the policy configuration and enforce it back to the NAC Controller.

1.To begin the process of importing the policy configuration from the device into the policy manager, open the policy manager and select File > Import > Policy Configuration from Device. The Import From Device wizard displays as shown in Figure 6‐25

Check the Class of Services box as shown and click the Next button to proceed.

Figure 6-25 Import From Device Wizard

2.The select devices window will display. Add the NAC devices you wish to import policy from to the right hand window. Click the Next button to proceed.

3.The Read From Device window will display as shown in Figure 6‐26 on page 6‐19. Select the roles and rules that you would like to add to this NAC Controller data file. Click the Next button to proceed.

6-18 Initializing the NAC Controller

Image 86
Contents Enterasys Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Appendix a Specifications and Regulatory Compliance NAC Controller PEP InstallationTroubleshooting Initializing the NAC ControllerIndex FiguresTables MGBIC-08 Xiv Who Should Use This Guide How to Use This GuideAbout This Guide Related Documents For Refer toTypographical Conventions Commonly Used AcronymsGetting Help Introduction OverviewN1-7C111 Chassis NAC Controller PEPOverview 2S4082-25 NAC Controller PEP 2S4082-25 NAC Controller PEP7S4280-19 NAC Controller PEP 7S4280-19 NAC Controller PEPPower Supply Status Through System Management Redundant Power SuppliesPower Supply Lanview LEDs Auto-Ranging Power SuppliesStandards Compatibility Lanview Diagnostic LEDsSecure Networks Policy Support Standalone or Rack Mountable ChassisLanview Diagnostic LEDs Introduction Installation Requirements and Guidelines Site GuidelinesPower Supply PS LED Status Definitions Configuration GuidelinesPower Supply LEDs Lanview LEDsFan LED States and Definitions NAC Controller PEP Network RequirementsFan LED LED Color Status100BASE-TX Network Link Aggregation10BASE-T Network 1000BASE-T Network1000BASE-SX/LX/ELX Network Page Enterasys Matrix N1 Chassis Setup Unpacking the Enterasys Matrix N1 ChassisOrder of Installation Setting Up the Enterasys Matrix N1 ChassisInstalling the Chassis on a Flat Surface QuantityInstalling the Chassis on the Rack Shelf Installing the Chassis into a RackInstalling the Rubber Feet Installing the Chassis Directly to the Rack Attaching the Electrostatic Discharge Wrist StrapPowering Up a Enterasys Matrix N1 Chassis ESD Grounding ReceptacleConnecting the 15-Amp AC Power Cords Cooling FansUnpacking the NAC Controller PEP NAC Controller PEP InstallationRequired Tools Important NoticeInstalling Optional Mini-GBICs Contents of Module Carton QuantityInstallation Mini-GBIC with LC Connector Installing NAC Controller PEP into the Matrix N1 Chassis Removing the Mini-GBICInstallation PreparationN1 Chassis slot Metal back panel FTM2 backplane connectors Connecting to the NetworkConnecting UTP Cables to the 2S4082-25 NAC Controller PEP cardConnecting a Twisted Pair Segment to the NAC Controller PEP RJ45 connector RJ45 port connector port Group Select buttonRX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to Mini-GBICs 10 Cable Connection to MT-RJ Fiber-Optic Connectors 11 Cable Connection to LC Fiber-Optic Connectors Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Parameter SettingConnecting to a VT Series Terminal 12 Connecting an IBM PC or CompatibleConnecting to a Modem 13 Connecting a VT Series TerminalRJ45 Adapter Wiring and Signal AssignmentsCOM Port Adapter Wiring and Signal Diagram Modem Port Adapter Wiring and Signal Diagram Completing the InstallationVT Series Port Adapter Wiring and Signal Diagram RJ45 DB25First-Time Log-In Using a Console Port Connection 15 Matrix DFE Startup Screen Example N7 Chassis About the Management Mgmt LED TroubleshootingUsing Lanview Viewing the Receive and Transmit ActivityLanview LEDs for the 2S4082-25 Lanview LEDs for the 7S4280-19Alternating 67% on, 33% off Lanview LEDsColor State Recommended Action Troubleshooting Checklist Series Configuration Guide for proper setupTroubleshooting Checklist Problem Possible Cause Recommended ActionOverview of the NAC Controller PEP Shutdown Procedure OFFLINE/RESET Switch for the 2S4082-25Recommended Shutdown Procedure Last Resort Shutdown ProcedurePage Initializing the NAC Controller NAC Controller Ports General Management Considerations Layer 3 NAC Controller PositioningLayer 2 In-Band Management Topology Layer 2 Out-Of-Band Management Topology Preparation for NAC Controller Initialization Layer 3 Out-Of-Band ManagementNAC Controller Initialization Procedure Choose NAC Controller Installation TypeEnter the Management Vlan ID NAC Controller Initialization Procedure 12 Setup NAC Controller PEP Networking 13 Enter NetSight Server IP Address 16 Configure System Date and Time 17 Set the System Date 19 Select the UTC/Local Hardware Clock Setting 21 Enable an Snmp Daemon NAC Controllers Require Separate Domains NAC Controller Policy ConfigurationSetup the Vlan Configurations 24 Determining NAC Controller Mode of Operation Modifying NAC Controllers Preconfigured Policy 25 Import From Device Wizard26 Import From Device Wizard 28 Services Screen Adding Assessment Classification RulesModifying the Downstream Default Policy Page Physical Specifications Specifications and Regulatory Compliance7C111 Chassis Specifications and Regulatory Compliance Table A-1 Chassis Specifications PhysicalRegulatory Requirements Power SupplyEnvironmental Requirements External Power Supply NAC Controller Engine Interface SpecificationsTable A-5 NAC Controller Engine Specifications Ports Processor/MemoryNAC Controller Engine COM Port Pinout Assignments Table A-5 NAC Controller Engine SpecificationsTable A-6 COM Port Pin Assignments Signal Name Input/Output EnvironmentalPorts NAC Controller PEP 2S4082-25 Module SpecificationsTable A-7 Specifications for 2S4082-25 Processors/MemoryTable A-9 Specifications NAC Controller PEP 7S4280-19 SpecificationsTable A-8 COM Port Pin Assignments Signal Name Input/Output 2S4082-25 COM Port Pinout Assignments7S4280-19 COM Port Pinout Assignments Mini-GBIC Input/Output SpecificationsTable A-10 Mini-GBIC Input/Output Port Specifications MGBIC-LC03 Specifications 1000BASE-SX Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELXRegulatory Compliance MGBIC-02 Specifications 1000BASE-TTable A-20 MGBIC-02 / Specifications Table A-21 Compliance StandardsMode Switch Bank Settings Optional Installations Setting the Mode SwitchesMemory Locations and Replacement Procedures Location of Memory ModulesConnector fingers Flash Dimm Replacement ProcedureConnector arms Flash DimmInstalling the Dimm Figure B-4 Installing the DimmConnector contacts Dram Simm Replacement ProcedureInstalling the Dram Simm Removing the Dram SimmDram Simm Connector arms Connector contacts Dram Simm alignment notchesIndex NumericsIndex-2