Enterasys Networks B2G124-24 manual Cable Connection to LC Fiber-Optic Connectors

Page 60

Connecting to the Network

Figure 3-19 Cable Connection to LC Fiber-Optic Connectors

Ã

Â

21

22 23

24

B2G124-24

À

Á

1

Mini-GBIC MT-RJ port connector

3

Release tab

2

LC cable connector

4

Link/Activity LED

3.Plug the other end of the cable into the appropriate port on the other device. Some cables may be terminated at the other end with two separate connectors, one for each fiber‐optic strand. In this case, ensure that the transmit fiber‐optic strand is connected to the receive port and the receive fiber‐optic strand to the transmit port.

4.Verify that a link exists by checking that the port Link/Activity LED is on (blinking green or solid green). If the Link/Activity LED is off, perform the following steps until it is on:

a.Verify that the device at the other end of the segment is ON and connected to the segment.

b.If there are separate fiber‐optic connections on the other device, check the crossover of the cables. Swap the cable connections if necessary.

c.Check that the fiber‐optic connection meets the dB loss and cable specifications outlined in the Cabling Guide for multimode mode cabling. To obtain this document, refer to “Related Documents” on page xvi.

d.If a link has not been established, refer to Chapter 4 for LED troubleshooting details. If a problem persists, refer to refer to “Getting Help” on page 1‐8 for details on contacting Enterasys Networks for support.

5.Repeat steps 1 through 4, above, until all connections have been made.

3-30 Hardware Installation

Image 60
Contents Enterasys SecureStack B2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsFor Refer to Conventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xviii About This Guide Introduction For information about Refer toOverview B2G124-24 and B2G124-48B2G124-24 Stackable Switch B2H124-48 Stackable Switch B2H124-48Redundant Power Supply Capability ConnectivityHigh-Speed Stack Connections Description of Mini-GBICs Specification MGBIC-LC01Lanview Diagnostic LEDs Switch Configuration Using WebViewSwitch Configuration Using CLI Commands ManagementGetting Help Support@enterasys.comNetwork Requirements 10BASE-T Network100BASE-TX Network 1000BASE-FX Network1000BASE-T Network Hardware Installation Considerations Prior to Installation Unpacking the SwitchContents of Switch Carton Quantity Required ToolsInstalling Optional Mini-GBICs PreparationInstallation Removing the Mini-GBIC Installing the Switch on a Flat Surface Installing the Rubber FeetChassis Bottom, Rubber Feet Placement Guidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceRack Mounting the Switch Guidelines for Rackmount InstallationAttaching Brackets and Installing in Rack Connecting High-Speed Stacking Cables Attaching the Rackmount BracketsConnecting High-Speed Stacking Cables Configuring Switches in a Stack About SecureStack B2 Switch Operation in a StackConfiguring Switches in a Stack Recommended Procedures for New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesConnecting AC and RPS-SYS Power AC PowerSwitch Rear View C2RPS-SYS Redundant Power System Stack Initialization OverviewConnecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting an IBM PC or CompatibleConnecting to a Modem 11 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables13 Connecting a UTP Cable Segment to RJ45 Port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ 1 RX1- 2 TX2+ 3 TX3+ 4 RX3- 5 RX2- 6 TX4+ 7 RX4 Connecting Fiber-Optic Cables to MT-RJ Ports B2G124-24 Connecting Fiber-Optic Cables to LC Ports Connecting to the Network 19 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementCompleting the Installation Hardware Installation Troubleshooting Using Lanview Lanview LEDs of B2G124-24 and B2G124-48 B2G124-24 shownLanview LEDs of B2H124-48 Lanview LEDs Color State Recommended ActionRPS Troubleshooting Checklist Refer to the SecureStack B2 Configuration Guide for properRefer to the SecureStack B2 Configuration Guide for Using the Reset Switch Reset SwitchSpecifications Switch SpecificationsTable A-1 Switch Specifications ItemSpecification B2G124-24 Table A-1 Switch Specifications ItemSpecification B2G124-48 B2H124-48Physical Table A-1 Switch Specifications EnvironmentalMini-GBIC Input/Output Specifications Gigabit Ethernet SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX Table A-2 Mini-GBIC Input/Output Port SpecificationsMGBIC-LC03 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELXTable A-9 MGBIC-08 Optical Specifications Table A-10 MGBIC-08 Operating Range 1550 nmMGBIC-02 Specifications 1000BASE-T Table A-11 MGBIC-02 SpecificationsConsole Port Pinout Assignments Regulatory Compliance Table A-12 Compliance Standards Regulatory ComplianceIndex NumericsPinout assignments console port A-7