Enterasys Networks G3G124-24, G3G124P-24, G3G170-24 manual Removing a Power Supply

Page 35

Removing a Power Supply

6.With the power supply properly inserted into the opening, carefully slide the module until it connects to the backplane, as shown in Figure 2‐2 on page 2‐9. The module’s handle should be nearly flush with the back of the G‐Series switch. If significant resistance is encountered before the power supply is seated, remove and reinsert it. Do not force the module into place.

Figure 2-2 Installing a Power Supply Module (1200-watt module into PWR 2 slot shown)

1 Power supply

2 Power supply handle

3 Captive screws

7.Secure the power supply to the chassis by tightening the captive screws.

8.If you are installing an additional power supply, repeat step 4 through step 7. If not, ensure that the unused power slot has a coverplate installed over it.

Removing a Power Supply

To remove a power supply, proceed as follows:

1.Attach an anti‐static wrist strap before handling the power supply module.

2.Unplug the associated power cord from the outlet.

3.Unplug the power cord from the AC inlet (associated with the power supply you are removing) at the back of the chassis.

4.Unscrew the captive screws to release the power supply from the chassis.

5.Remove the power supply by grasping the handle and pulling it straight out of the chassis.

6.Fasten a coverplate over the empty slot.

Caution: If you plan to operate the chassis with only one power supply, be sure to install the coverplate in place of the removed power supply to contain EMI radiation and ensure proper air circulation.

Precaución: Si desea trabajar sólo con una fuente de poder, no olvide colocar la tapa en el compartimiento de la fuente de poder que haya eliminado, para reducir la interferencia electromagnética y para asegurar una buena ventilación.

Enterasys G-Series Hardware Installation Guide 2-9

Image 35
Contents Enterasys G-Series Page Page Regulatory Compliance Information AS/NZS Cispr Supplement to Product Instructions Warnhinweis Faseroptikanschlüsse Optische Sicherheit Safety Information Class 1 Laser TransceiversDeclaration of Conformity Enterasys NETWORKS, INC. Firmware License Agreement Viii Page Page Contents Index TroubleshootingAppendix a Specifications Tables Xiv For information about Refer to How to Use This GuideWho Should Use This Guide Related DocumentsCommonly Used Acronyms Document ConventionsGetting Help Getting Help Xviii About This Guide Overview IntroductionFeatures Standalone or Rack Mountable Chassis Fan Management PoE Power over Ethernet SupportPowered Device Classifications PDs Features Features Introduction Installation Optional Enterasys Components Unpacking the G-Series SwitchShipped With the Switch Required and Shipped SeparatelyG3G124-24 Optional PoE Module Installation Considerations Order of Installation StepsMounting the Switch Installing the Switch into a Rack Placing the Switch on a Flat SurfacePower Supply Redundancy Power Supply Installation ConsiderationsSupported Power Configurations Power Distribution Upon Power Supply Removal or Addition Allocation of PoE Power to ModulesManagement of PoE Power to PDs Installing a Power SupplyPower supply Power supply handle Captive screws Removing a Power SupplyInstalling an Optional PoE Module on the G3G-24TX IOM Installing and Removing an IOMInstalling a PoE module in the G3G-24TX IOM Installing an IOMIOM handle IOM Initialization BehaviorIOM slot Removing an IOM Connecting Power to the SwitchDisplay Status Connecting to the Console PortConnecting to the RJ45 Console Port Power LED DisplaysPin Connection Signal RJ45 Pin DB9 PinConsole Port Pinout RJ45 to DB9 Adapter PinoutConnecting UTP Cables to RJ45 Ports Connecting to the NetworkConnecting to the USB Console Port Connecting a UTP Cable Segment to RJ45 Port TX1+ RX1- TX2+ TX3+ RX3- RX2- TX4+ RX4 Transceiver Type Switch or IOM Ports Installing Optional SFP/XFPConnecting to the Network Removing an XFP/SFP Connecting Fiber-Optic Cables to SFP/XFP PortsCompleting the Installation Removing the Switch Cover Installing an Optional PoE Module in the G3G124-24 SwitchInstalling the PoE Module Troubleshooting Display Status IOM power off status LEDs Slot 2, 3Checking the LEDs System LED DefinitionsFixed and IOM Port LEDs Power LEDsIOM Status LEDs Locating the Password Reset button Using the Password Reset ButtonRemoving the Switch from a Rack Removing the Switch from a Rack Troubleshooting G3G124-24 and G3G124-24P Switch SpecificationsTable A-1 G3 Switch Specifications SpecificationPhysical Power SpecificationsProcessors/Memory PerformanceTable A-3 G3G-24TX IOM Specifications Power Supply SpecificationsIOM Specifications Table A-2 Power Supply SpecificationsG3G-24SFP Table A-4 G3G-24SFP IOM SpecificationsG3K-2XFP and G3K-4XFP Table A-5 G3K-2XFP and G3K-4XFP IOM SpecificationsTable A-7 Recommended Torque Values by Screw Size PoE Daughter Card SpecificationsTable A-6 G3G-POE Specifications Torque ValuesTable A-10 MGBIC-LC01/MGBIC-MT01 Operating Range MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXTable A-8 Mini-GBIC Input/Output Port Specifications Table A-9 MGBIC-LC01/MGBIC-MT01 Optical SpecificationsMGBIC-LC04 Specifications 100BASE-FX MGBIC-02 Specifications 1000BASE-TMGBIC-LC03 Specifications 1000BASE-SX MGBIC-LC07 Specifications 1000BASE-ELX MGBIC-LC05 Specifications 100BASE-FXMGBIC-LC09 Specifications 1000BASE-LX MGBIC-08 Specifications 1000BASE-ELXConsole Port Pinout Assignments Gigabit Ethernet Transceiver XFP SpecificationsTable A-24 XFP Specifications Table A-25 Recommended Cable Types and SpecificationsRegulatory Compliance Standards Regulatory ComplianceTable A-26 Compliance Standards Index Index-2
Related manuals
Manual 59 pages 23.28 Kb