Installing an Optional PoE Module in the
c.For details on how to configure the G‐Series using the command line interface, refer to the Enterasys G‐Series CLI Reference. The CLI commands enable you to set a new password and perform more involved management configurations on the G‐Series.
Note: It is strongly recommended that you change the admin password from its default state of blank (no password), once the
If you require assistance, contact Enterasys Networks using one of the methods described in “Getting Help” on page xvii.
Installing an Optional PoE Module in the G3G124-24 Switch
Installing PoE capability in the G3G124‐24 base switch requires significant disassembly of the switch. Before installing the PoE module, you must complete the following steps:
1.Unplug all power and network connections to the switch.
2.Remove IOM(s). Refer to “Removing an IOM” on page 2‐13.
3.Remove power supplies. Refer to “Removing a Power Supply” on page 2‐9.
4.Remove and retain screws securing the switch cover top and compact flash coverplate and remove the switch cover. Refer to “Removing the Switch Cover” on page 2‐23.
Note: Instructions for installing PoE on the base switch do not apply to the
Removing the Switch Cover
If you have purchased an optional PoE module (G3G‐POE), have unplugged all network and power connections and removed power supplies, you must remove the switch cover as follows to access the PoE board connectors in the G3G124‐24 base chassis.
Caution: Be sure to retain all screws removed from the
Precaución: Asegúrese de colocar todos los tornillos que haya retirado de la cubierta del switch G- Series en un lugar seguro, para evitar perderlos. Cualquier tornillo suelto que se deje en el interior del switch podría dañar sus componentes.
1.Refer to Figure 2‐12 on page 2‐24 to locate all screws necessary for removing the cover.
Enterasys