Enterasys Networks G3G124-24P, G3G170-24 manual Installing and Removing an IOM

Page 31

Installing and Removing an IOM

Installing and Removing an IOM

Caution: There are hazardous moving parts inside the base unit. Keep fingers and other body parts away from spinning fans when installing or removing IO modules.

Precaución: El interior de la unidad que sirve de base contiene partes móviles peligrosas. Mantenga los dedos y cualquier otra parte del cuerpo lejos de las aspas de los ventiladores cuando realice la instalación o al retirar los módulos IO.

Installing an Optional PoE Module on the G3G-24TX

Notes: Instructions in this section do not fully describe installing PoE on the G3G124-24 base system, which requires completing several disassembly steps first. For more information on base system assembly, refer to “Installing an Optional PoE Module in the G3G124-24 Switch” on page 2-21.

The instructions below apply only to the G3G-24TX IOM module.

If you have purchased an optional PoE card (G3G‐POE), you can install it before installing the G3G‐24TX IOM into the G‐Series base system chassis. You can also install it at any time by first removing the IOM module as described in “Removing an IOM” on page 2‐11.

The G‐Series PoE card and IOM module will be shipped in separate packages. Unpack and install the PoE card in the IOM as follows:

1.With an ESD strap attached to your wrist, open the box and remove the packing material protecting the PoE module.

2.Perform a visual inspection of the PoE module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page xv for details.

Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive electronic equipment.

Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones de seguridad para evitar descargas de electricidad estática.

3.Gently plug the PoE module into the IOM by fitting the standoffs into the PoE board mounting holes as shown in Figure 2‐3. There should be a direct vertical translation of standoffs to PoE mounting holes.

Enterasys G-Series Hardware Installation Guide 2-9

Image 31
Contents Enterasys G-Series Page Page Class a ITE Notice Clase A. Aviso de ITE Product SafetyFederal Communications Commission FCC Notice Industry Canada NoticeHazardous Substances Electromagnetic Compatibility EMCCompatibilidad Electromágnetica EMC Elektro- magnetische Kompatibilität EMCSupplement to Product Instructions Vcci Notice Safety Information Class 1 Laser TransceiversBsmi EMC Statement Taiwan USA Declaration of ConformityVii Viii Contents Appendix a Specifications Index Xii Related Documents How to Use This GuideAbout This Guide Who Should Use This GuideCommonly Used Acronyms Document ConventionsGetting Help Getting Help Xvi About This Guide Overview IntroductionFeatures Standalone or Rack Mountable Chassis PoE Power over Ethernet SupportFan Management Powered Device Classifications PDsFor information about Refer to InstallationOptional Enterasys Components Unpacking the G-Series SwitchShipped With the Switch Required and Shipped SeparatelyMounting the Switch Order of Installation StepsG3G124-24 Optional PoE Module Installation Considerations Installing the Switch into a Rack Placing the Switch on a Flat SurfaceInstalling and Removing a Power Supply Power Supply Removal Power Supply PlanningPower Supply Addition or IOM Removal Installing a Power SupplyPower supply Power supply handle Captive screws Removing a Power SupplyInstalling an Optional PoE Module on the G3G-24TX Installing and Removing an IOMFastening screws IOM connector PoE daughter card module Installing an IOMIOM slot Removing an IOMIOM handle IOM module Display Status Connecting Power to the SwitchPin Connection Connecting to the Console PortConnecting to the RJ45 Console Port Console Port PinoutSignal RJ45 Pin DB9 Pin Connecting to the NetworkConnecting to the USB Console Port Connecting UTP Cables to RJ45 PortsConnecting a UTP Cable Segment to RJ45 Port Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX Installing Optional SFP/XFP Connecting to the Network Removing an XFP/SFP Connecting Fiber-Optic Cables to SFP/XFP PortsCompleting the Installation Removing the Switch Cover Installing an Optional PoE Module in the G3G124-24 SwitchInstalling the PoE Module Troubleshooting System LED Definitions Checking the LEDsDisplay Status IOM Status LEDs Power LEDsFixed and IOM Port LEDs Removing the Switch from a Rack Using the Reset ButtonSpecification SpecificationsSwitch Specifications Table A-1 G3 Switch SpecificationsPerformance Power SpecificationsG3G170-24 Processors/MemoryG3G-24TX IOM Module SpecificationsTable A-2 G3G-24TX IOM Specifications Table A-3 G3G-24SFP IOM SpecificationsG3K-2TX and G3K-4TX Table A-4 G3K-2TX and G3K-4TX IOM SpecificationsScrew Size Torque in Pounds Bit Size Table A-6 Mini-GBIC Input/Output Port SpecificationsTorque Values Table A-5 Recommended Torque Values by Screw SizeTable A-9 MGBIC-02 Specifications MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXMGBIC-02 Specifications 1000BASE-T Table A-7 MGBIC-LC01/MGBIC-MT01 Optical SpecificationsTable A-11 MGBIC-LC03 Operating Range MGBIC-LC03 Specifications 1000BASE-SXMGBIC-LC04 Specifications 100BASE-FX Table A-10 MGBIC-LC03 Optical SpecificationsMGBIC-LC07 Specifications 1000BASE-ELX MGBIC-LC05 Specifications 100BASE-FXMGBIC-08 Specifications 1000BASE-ELX Gigabit Ethernet Transceiver XFP SpecificationsMGBIC-LC09 Specifications 1000BASE-LX Regulatory Compliance Table A-22 XFP Fiber-Optic SpecificationsTable A-23 Recommended Cable Types and Specifications Console Port Pinout AssignmentsNumerics Index
Related manuals
Manual 70 pages 46.57 Kb