Enterasys Networks A2H124-24FX manual Recommended Procedures for New and Existing Stacks

Page 42

Configuring Switches in a Stack

3.The management election process uses the following precedence to assign a management switch:

a.Previously assigned/elected management switch

b.Management assigned priority (values 1–15)

c.Hardware preference level

d.Highest MAC Address

Recommended Procedures for New and Existing Stacks

Important

The following procedures assume that all switches have a clean configuration from manufacturing. When adding a new switch to an already running stack, it is also assumed that the new switch is using the same firmware image version as other switches in the stack.

Installing a New Stackable System of Up to Eight Switches

Use the following procedure to install a new stack of up to eight switches out of the box. Before applying power, make all physical connections with the stack cables as described in “Connecting Stacking Cables” on page 3‐11.

1.Once all of the stack cables have been connected, individually power on each switch from top to bottom (connecting power to a switch is described in “Connecting AC and RPS‐SYS Power” on page 3‐16).

If the switches are powered on almost simultaneously, the system will automatically select the first one that powers up as the Master switch and the others as Member switches. The switches are assigned unit IDs in the order that they become fully operational.

You can control the unit ID assignment according to the physical position in a stack. When you power up each switch and allow it to become fully operational before applying power to the next switch, the first one becomes the Manager and all the next switches will join that stack (regardless of Priority, Firmware Revision, or MAC Address). The switches are assigned unit IDs in the order that you power on each switch.

Note: Once switch IDs are assigned, they are persistent and will be retained during a power cycle to any or all of the switches.

2.(Optional) If desired, change the management switch using the set switch movemanagement command as described in the SecureStack A2 Configuration Guide.

3-14 Hardware Installation

Image 42 Contents
SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Page Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideHow to Use This Guide Related DocumentsConventions Used in This Guide Following conventions are used in this guideConventions Used in This Guide Xviii About This Guide Introduction Overview A2H124-24FXRedundant Power Supply Capability Stack ConnectionsConnectivity Description of Mini-GBICsSwitch Configuration Using CLI Commands Lanview Diagnostic LEDsSwitch Configuration Using WebView ManagementGetting Help Support@enterasys.comNetwork Requirements 100BASE-FX Multimode Fiber-Optic Network1000BASE-FX Fiber-Optic Network 1000BASE-T Twisted Pair Gigabit Ethernet NetworkHardware Installation Considerations Prior to Installation Unpacking the SwitchRequired Tools Installing Optional Mini-GBICs PreparationInstallation Mini-GBIC with MT-RJ Connector Mini-GBIC with LC Connector Removing the Mini-GBICInstalling the Switch on a Flat Surface Installing the Rubber FeetGuidelines for Flat Surface Installation Chassis Bottom, Rubber Feet PlacementArea Guidelines for Switch Installation on Flat Surface Rack Mounting the Switch Guidelines for Rackmount Installation Attaching Brackets and Installing in Rack Connecting Stacking Cables Attaching the Rackmount BracketsStacking Cable Connections Configuring Switches in a Stack About SecureStack A2 Switch Operation in a StackRecommended Procedures for New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesImportant Considerations About Using Clear Config in a Stack Connecting AC and RPS-SYS Power AC PowerSwitch Rear View C2RPS-SYS Redundant Power System RPS coverplate Screw holes for coverplateStack Initialization Overview Connecting to Console Port for Local Management What Is NeededConnecting to an IBM or Compatible Device DB9 female connector Serial interface cableConnecting to a VT Series Terminal 13 Connecting a VT Series TerminalConnecting to a Modem 14 Connecting to a ModemConnecting to the Network 15 Connecting a Fiber-Optic Cable Segment to MT-RJ Port Connecting Fiber-Optic Cables to MT-RJ Mini-GBIC Ports SecureStack A2 Installation Guide Connecting Fiber-Optic Cables to LC Mini-GBIC Ports Connecting to the Network Connecting UTP Cables to RJ45 Mini-GBIC Ports 16 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Completing the Installation Initial Logon to Switch ManagementCompleting the Installation Hardware Installation Troubleshooting Using Lanview Lanview LEDs of A2H124-24FXLED Down RPS Troubleshooting Checklist Configuration Guide for proper setupConfiguration Guide for the IP address Refer to the SecureStack A2 Using the Reset Password Switch Reset Password SwitchUsing the Reset Password Switch Troubleshooting Specifications Switch Specifications Table A-1 A2H124-24FX Switch SpecificationsMini-GBIC Input/Output Specifications Table A-1 A2H124-24FX Switch Specifications EnvironmentalGigabit Ethernet Specifications MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXMGBIC-LC03 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LXMGBIC-08 Specifications 1000BASE-ELX MGBIC-02 Specifications 1000BASE-TConsole Port Pinout Assignments Regulatory ComplianceRegulatory Compliance Specifications Index Index-2