Enterasys Networks C3G124-24P, C3G124-48P manual Connecting a UTP Cable Segment to RJ45 Port

Page 62

Connecting to the Network

Figure 3-13 Connecting a UTP Cable Segment to RJ45 Port

Â

1

1

2

 

 

3

 

4

 

5

 

6

 

7

 

8

2

9

10

 

11

Á

À

12 11

 

 

12

1 RJ45 connector

2 Port 8

3 Port 8 Link/Activity LED

3.Verify that a link exists by checking that the Link/Activity LED is ON (solid green or blinking green).

Note: If the cable is connected to one of the PoE RJ45 front panel ports, solid green or blinking green also indicates that PoE power is available. If the LED is solid amber or blinking amber PoE power failed. For more details, refer to Chapter 4.

4.If the Link/Activity LED is OFF, perform the following steps until it is on:

a.Verify that the cabling being used is Category 5 or better with an impedance between 85 and 111 ohms with a maximum length of 100 meters (328 feet).

b.Verify that the device at the other end of the twisted pair segment is on and properly connected to the segment.

c.Verify that the RJ45 connectors on the twisted pair segment have the proper pinouts and check the cable for continuity. Typically, a crossover cable is used between hub devices. A straight‐through cable is used to connect between switches or hub devices and an end user (computer). Refer to Figure 3‐14 and Figure 3‐15 for four‐wire RJ45 connections. Refer to Figure 3‐16 and Figure 3‐17 for eight‐wire RJ45 connections.

d.Ensure that the twisted pair connection meets the dB loss and cable specifications outlined in the Cabling Guide. Refer to “Related Documents” on page xvi for information on obtaining this document.

5.If a link is not established or there is no PoE power, contact Enterasys Networks. Refer to “Getting Help” on page xviii for details.

Repeat all steps above until all connections have been made.

SecureStack C3 Installation Guide 3-23

Image 62 Contents
Enterasys SecureStack C3 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures Xiv About This Guide Who Should Use This GuideFor Refer to How to Use This GuideRelated Documents Conventions Used in This Guide Following conventions are used in this guideGetting Help Support@enterasys.comC3G124-24P Stackable Switch OverviewC3G124-24P Stackable Switch C3G124-48P Stackable Switch Redundant Power Supply Capability High-Speed Stack ConnectionsPoE Power over Ethernet Support Powered Device Classifications Usage PD Maximum Power RangeDescription of Mini-GBICs Specification ConnectivityManagement Switch Configuration Using WebViewSwitch Configuration Using CLI Commands Standards CompatibilityLanview Diagnostic LEDs Network Requirements 1000BASE-FX Network 10BASE-TX Network100BASE-TX Network 1000BASE-T NetworkHardware Installation Contents of Switch Carton Quantity Considerations Prior to InstallationUnpacking the Switch Required ToolsInstalling Optional Mini-GBICs Preparing to Install a Mini-GBICInstalling a Mini-GBIC Mini-GBIC with MT-RJ ConnectorMini-GBIC with LC Connector Removing a Mini-GBICInstalling the Switch on a Flat Surface Installing the Rubber FeetChassis Bottom, Rubber Feet Placement Guidelines for Flat Surface Installation Area Guidelines for Switch Installation on Flat SurfaceAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Attaching the Rackmount Brackets Connecting High-Speed Stacking Cables Configuring Switches in a Stack About SecureStack Switch Operation in a StackConfiguring Switches in a Stack Recommended Procedures to Install New and Existing Stacks Installing a New Stackable System of Up to Eight SwitchesConnecting AC and PoE Power AC PowerConnecting AC Power and RPS PoE Redundant Power System Stack Manager SelectionConnecting to Console Port for Local Management What Is Needed Connecting to an IBM or Compatible Device Parameter SettingConnecting to a VT Series Terminal 10 Connecting an IBM PC or CompatibleConnecting to a Modem 11 Connecting a VT Series TerminalConnecting to the Network Connecting UTP Cables13 Connecting a UTP Cable Segment to RJ45 Port 14 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting Fiber-Optic Cables to MT-RJ Ports Connecting to the Network Connecting Fiber-Optic Cables to LC Ports 19 Cable Connection to LC Fiber-Optic Connectors Completing the Installation Initial Logon to Switch ManagementTroubleshooting Using LanviewC3G124-24P Lanview LEDs C3G124-48P Lanview LEDs Lanview LED Diagnostic Indications Color State Recommended ActionRPS Mgbic Troubleshooting Checklist Refer to the SecureStack C3 Configuration Guide for the IPUsing the Reset Switch Reset SwitchUsing the Reset Switch Using the Reset Switch Troubleshooting Switch Specifications Table A-1 C3G124-24P and C3G124-48P SpecificationsC3G124-48P Mini-GBIC Input/Output Specifications Table A-2 Mini-GBIC Input/Output Port SpecificationsGigabit Ethernet Specifications MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SXMGBIC-LC03 Specifications 1000BASE-SX MGBIC-LC09 Specifications 1000BASE-LXTable A-9 MGBIC-08 Optical Specifications MGBIC-08 Specifications 1000BASE-ELXMGBIC-02 Specifications 1000BASE-T Table A-11 MGBIC-02 SpecificationsTable A-12 Compliance Standards Regulatory Compliance Console Port Pinout AssignmentsRegulatory Compliance Regulatory Compliance Specifications Index MGBIC-LC03 A-5 MGBIC-LC09 A-5