9The 2161DS Console Switch will begin the FLASH upgrade process.
CAUTION: Do not cycle power to the 2161DS Console Switch during this process. A loss of power will render the 2161DS Console Switch inoperable and require the unit be returned to the factory for repair.
10Once the upgrade is complete, a verification message will appear on screen.
Upgrading the SIP
The Server Interface Pods (SIPs) or Avocent® AVRIQs can be upgraded individually or simultaneously. As long as an upgrade is in progress, you cannot initiate another.
NOTICE: Do not cycle power to the server or disconnect the SIP during this process. A loss of power will render the SIP inoperable and require the unit be returned to the factory for repair.
To simultaneously upgrade multiple SIPs:
1Press <Print Screen>. The Main dialog box will appear.
2Click
Figure 5-40. SIP Status Dialog Box.
3Click one or more types of SIPs you wish to upgrade. Click Upgrade. The SIP Load dialog box appears.