Cisco Systems SFS 7008 manual Mount the Topspin 270 Chassis in a Rack, Requirements

Page 22

22

Mount the Topspin 270 Chassis in a Rack

This section describes how to install the Topspin 270 chassis in an equipment rack. The following procedure is the standard installation, using your own rack shelf.

Topspin also has an optional shelf that is appropriate for pre-racking and shipping a unit in the rack. If you have purchased this shelf unit separately, refer to the documentation that is provided in the shelf kit package.

Requirements

In addition to the accessories provided with the server switch, you should have:

#2 phillips screwdriver

Rack with 6Us of available space

Shelf installed in the rack (not provided). The shelf must support the weight of the chassis, which can be up to 106 pounds with all possible components installed.

Screws appropriate to your rack, which are used to secure the rack handles to the rack posts.

Three people are recommended to lift the switch into the rack; however, the procedure can be performed by two people.

Note: The Topspin 270 chassis weighs up to 106 pounds (fully loaded).

Rack Mount Installation

To mount the Topspin 270 chassis in a rack:

1.Remove the CD-ROM, parts bag, and documentation from the box.

2.Remove the packaging from around the chassis.

3.Install a shelf for the chassis, if you have not already done so. Verify that the shelf can support the weight of the chassis, which can be up to 106 pounds with all possible components installed.

Figure 2-1:Install Appropriate Rack in Shelf

Image 22
Contents Part Number OL-7725-01 Product ID Page Regulatory Notices Vii Managing Individual Components Monitoring the Topspin 270 System 107 FCC Statement Safety Information Electrical CautionsViii Contact Information General CautionsPage System Architecture Hot StandbyHi-Availability InfiniBand ConnectivityFlexibility HardwareNon-Blocking Architecture Diagram of the ChassisAbout the Topspin 270 Chassis Fabric2Back Chassis View Chassis Slot Numbering 3Chassis Slot Numbering in Front Non-port SideConnections DimensionsPower Supplies LEDsFan Trays Management Interface ModulesMaster/Slave and Standby Roles Fabric Controller ModulesNode and Core Slots Node Slot Chassis ID Module Rack Alarm Line Interface Modules LIM How the Chassis ID is UsedAdministrative Features Read the Cautionary Statements Prepare the SitePrepare the Physical Environment for Topspin 270 System Mount the Topspin 270 Chassis in a Rack Rack Mount InstallationRequirements 2Unscrew Extra Rack Ears from the Chassis 3Chassis Set onto Shelf Install Optional HA Components 5Use Appropriate Screws to Attach Rack Ears to RailsConnect Management Devices Attach a Serial Console Cable to a PC or TerminalPower on the Chassis Recommended Management ConfigurationConnect an Ethernet Cable to the Ethernet Management Port Configure Basic Connectivity 8Power Jack LocationsAssigning an Address Statically Topspin-270config#interface mgmt-ethernetTopspin-270#copy running-config startup-config Assigning an Address DynamicallyAbout Connectors Connect Network DevicesConnecting InfiniBand Devices Manage the SystemPrepare Your Device Optional Launch the Chassis ManagerLaunch Chassis Manager 10Web Browser Window Optional Install the Element Manager GUI About a Failed Power Supply Power Supply ModulesAbout the Power Supply Modules About the Field Replaceable UnitsRemoving a Power Supply Module Locating the Power Supply ModulePower Cord back Power Supply front Installing a New Power Supply Module 3Pulling the Power Supply Module from the BayRemoving a Fan Module Fan Tray ModulesAbout the Fan Tray Modules About a Failed Fan Tray5Loosening Captive Screws Installing a Fan Module 7Pushing Fan Module into SlotAbout the Fabric Controllers Fabric ControllersRemoving a Fabric Controller 9Loosen Captive Screws Before Removing Installing a Fabric Controller Upgrading the Controller CardAbout LIM Cards Line Interface Management Modules LIMRemoving a LIM Card 12Removing a Pinch-Type Connector 14Loosen the Captive Screws Installing a LIM Module 17Closing the LIM Module LeversRemoving a Management Interface Module Management Interface ModulesAbout Management Interface Modules About a Failed Management Interface ModuleAbout Chassis ID Modules Installing a Management Interface ModuleChassis ID Modules Removing a Chassis ID Module20Loosen the Captive Screws Installing a Replacement Chassis ID Module Upgrade all Cards in a Chassis Upgrading a Topspin 270 with the CLISelect Maintenance File Management Upgrading a Topspin 270 with Element ManagerSelect Maintenance Boot Config Upgrading an Individual Controller Card Upgrading a Topspin 270 with the Chassis ManagerUpgrading a Controller Card with the CLI Show the standby Controller card Upgrading Individual Node Cards Upgrading a Node Card with the CLI5Copy the .img File to Server Switch Upgrading a Node Card with Element Manager6Watching the File Copy Progress 8Disable and Enable the Node Cards Upgrading Node Cards with the Chassis Manager Page Monitoring the Topspin 270 System Interpreting the Front Panel LEDsLocating the System-Wide Status LED System-Wide Status LEDInterpreting the System Status LED Power Supply LEDs Locating the Power Supply LEDsInterpreting the Power Supply LEDs 3Power Supply Identify LEDLocation Fan LEDsInterpreting the Fan LEDs Fabric Controller LEDs Interpreting the Fabric Controller LEDsInterpreting the Back Panel LEDs Management Interface Module LEDsInterpreting the Management Interface LEDs 6Management Interface Module LEDsFan Tray Module Status LEDs Chassis ID LEDs Master Management Connection Status LEDInfiniBand Port LEDs LIM Status LEDsInterpreting the LIM Status LEDs Monitor the Device Monitoring the System with Chassis ManagerInterpreting the InfiniBand Port LEDs Device Rear View and the Device Front View appear 11Chassis Manager 270 Device Front View Monitor the Cards 12Chassis Manager Cards WindowMonitor the InfiniBand Ports 13Chassis Manager Ports WindowMonitor the Power Supplies 14Chassis Manager Port Properties Dialog Box15Chassis Manager Power Supplies Window Monitor the FansMonitor the Temperature 17Chassis Manager Sensors WindowMonitoring the System with Element Manager Interpreting the Summary TabInterpreting the Fans Tab Interpreting the Power Supplies TabInterpreting the Sensors Tab Monitor the System With the CLI Monitor the Power SuppliesTopspin-270show power-supply Monitor the FansMonitor the Sensors Show sensorPage LED Tests About Diagnostic TestsSelf Tests Run Card Tests Topspin-270#show diagnostic cardRun a Card Self-Test Example of completed test Run Chassis Tests Topspin-270# more sysloghwiflogTopspin-270config#diag chassis test standard Run a Chassis Standard TestRun a Self-Test on a Fan Run Fan TestsTopspin-270#show diag post Enter the diag fan id command Run a LED Test on the Power Supply Run Power Supply TestsTopspin-270#show diag fru-error Topspin-270#show power-supply Run a Self-Test on a Power SupplyTopspin-270#show diag power-supply Topspin-270#show diag fru-error Topspin-270#show diagnostic post Displaying Hardware ErrorsTopspin-270#more sysloghwiflog Error Types Topspin-270#show diagnostic fru-error101 102 Specifications and Compliance Certifications Chassis and Management InterfaceEMC/Immunity Electrical SpecificationsSafety AcousticsProduct Markings 106 Index