Pinnacle Speakers Lightning 1000 manual Display Connection, Remote Control

Page 34

28

Note

Display Connection

To connect menu monitor display outputs:

1.Connect a customer-supplied SVGA monitor to the SVGA connector, for all “local” menu display monitoring requirements (in conjunction with the local alphanumeric keyboard).

2.Connect a customer-supplied composite monitor to the Composite connector, for remote menu display monitoring in the composite format (as required by your system configuration).

3.Connect a customer-supplied Y/C monitor to the Y/C connector, for remote menu display monitoring in the Y/C format.

The SVGA connection is the preferred one for maximum video quality.

The Composite and Y/C connections are less than ideal, and should be used only when absolutely necessary. These outputs are only available at resolutions less than 800 x 600.

Remote Control

The Lightning systems allow a variety of functions to be controlled exter- nally from three different classes of controllers: the Lightning Shotbox, GPI Triggers and RS-422 control via the Lightning Automation Protocol. This section includes information on connecting these control options to your Lightning 1000 system.

Lightning 1000 Installation Guide

Image 34
Contents Installation Guide FCC Compliance Lithium Battery Notice Lightning 1000 Installation GuideCopyright Power Supply Cord Notice Company AddressPage Contents Software Installation Appendix a Specifications IndexOverview TipPrimary Section Documentation ConventionsSecondary Section Documentation Terms Welcome to Lightning Lightning HardwareUser Interface Lightning SoftwareNetworking Word About Windows NT Remote ControlSystem Inputs and Outputs TechFAX and Website Related PublicationsCompany Address and Phone Numbers Hardware Installation This ChapterWhat You Will Need Chassis Dimensions Lightning HardwareChassis Front Components Figure below illustrates the front of the Lightning chassisChassis Rear Panel Components Lightning 1000 Installation Guide Lightning 1000 Installation Guide Chassis Backplane Components Lightning 1000 Installation Guide Chassis Internal Components Scsi Card Ch I/O Card opt Lightning 1000 Installation Guide Pinnacle ShotBox ComponentsRear ShotBox Components Setup Block Diagram Lightning ChassisLightning Chassis Power Requirements Preparing Your SiteConnecting Signals Installing HardwareUnpacking and Inspection Reference Connection Output Connection Input connectionControl and Network Connection Display Connection ShotBox Connection GPI ConnectionSimplified Schematic of GPI Interface Power Connection Automation Systems ConnectionsPower Up Procedure Power Down ProcedureSystem Interconnect Diagram LightningLightning 1000 Installation Guide Software Installation Software DescriptionInstalling Software System Files and User FilesSpecifications This AppendixLightning 1000 Installation Guide Symbols IndexSDI