Magma EB7-x8, EB7R-x8, EBU user manual APPENDIX B Compliance, Fcc/Ce/Ul, IndustryCanada

Page 74
APPENDIX B Compliance

APPENDIX B Compliance

FCC/CE/UL

NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and

(2)this device must accept any interference received including interference that may cause undesired operation.

Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.

NOTE

The assembler of a personal computer system may be required to test the system and/or make necessary modifications if a system is found to cause harmful interferences or to be noncompliant with the appropriate standards for its intended use.

IndustryCanada

This Class A digital apparatus complies with Canadian ICES-003. Cet appareil numériqué de la classe A est conformé à la norme NMB-003 du Canada

CE

The product(s) described in this manual complies with all applicable European Union (CE) directives. Magma will not retest or recertify systems or components that have been reconfigured by customers.

UL

EB7-x8 is UL Listed under the file number E211209

64

Image 74
Contents Model EB7-x8 Model EBU Model EB7R-x8 ExpressBoxUniversal EBU PCI Express to PCI Express ExpansionTrademark References Copyright 2009 Mission Technology Group, Inc. - DBA MagmaLimitation of Liability VERIFY INSTALLATION Table of ContentsHARDWARE INSTALLATION CHAPTER 4 INSTALL CARDS AND DRIVESTROUBLESHOOTING CHAPTER 5 MODULAR SOLUTIONS WITH EBUCHASSIS MAINTENANCE CHAPTER 8 HOW TO GET MORE HELP500Watt Power Supply Specifications Page Preface AdvisoriesSafetyInstructions When WorkingInsideaComputerProtecting Against Electrostatic Discharge Rack-Mount Instructions General Specifications Chapter 1 IntroductionPartsList Pre-InstallationInformationToolsRequiredfor Installation Item QtyChapter 2 Hardware Installation STOPInstall PCI Express Host Card Before you BeginAttach Power and Expansion Cables M A G M A STOPLaptop Installation optional the chassis along with the power cordTDP side to Laptop Picture B shows the Incorrect orientation RechecktheInstallation Hardware Check Applying Power CorrectlyStarting Up You may now proceed to Chapter 3 Verify Installation RackInstallationsShutting Down Windows Start UpM A G M A CHAPTER 3 Verify Installation WindowsMacOSX Expansion Slot UtilityApple System Profiler RedHat 9 Linux Mapping Physical Slot locationsto port locations using lspci Link Supported Speed 2.5Gb/s, Width x8, ASPM L0s L1, PortExample lspci -vvv Output Link Supported Speed 2.5Gb/s, Width x4, ASPM L0s, Port Cover Screws Chapter 4 Install Cards and DrivesRemove PCI Express Expansion Chassis Cover Remove all of these screws in order to open the enclosure Install 3rd PartyPCIe Cardsor Hard Drives Installing 3rd Party PCIe CardsInstalling Hard Drives “Hot-Swappable”PCIeCardsoptional System Should Be Up and RunningFinishingTouches 3. Select a device and click on the “Properties button” Procedure for hot-un-plugging a PCIe plug in cardDouble click on the applet 8. A green LED, labeled P X PwrE where Click on the Stop button of the dialogClick on the OK button of the new dialog corresponds to the slot number will begin10. The LED should start flashing again 11. After 5-6 seconds the LED will stop flashing and remain onPCIeExpansion Solutions with the EB7-x8 Digi Design Pro ToolsVideo Card expansion solutions High Throughput storage solutions ATI HD4850accessing our data 50% Reads 50% Writes I/O Test typeThroughput MByte/sec 100% ReadsChapter 5 Modular Solutions with EBU Configuring a complete computer withEBUConfiguring EBU for I/OSharingbetweenmultiple Blades or Other Servers Virtualization, Clusters, and EBUability of its chassis to allow for peer to peer communication between its slots as well as its ability to communicate with multiple Root Complex Port sources with its complementary Universal Host Adaptor product lends itself to very elegant and immensely cost effective I/O virtualization applications Chapter 6 Chassis Maintenance General Chassis CleaningNext, use a can of compressed air from your local computer store to blow out any dust that may have accumulated in the chassis fans “Hot-Swappable”PowerSupply Optional CleaningtheAirFilter M A G M A My Computer Can’t Find the PCIe Expansion System Chapter 7 TroubleshootingLocatethe Problem ƒ When Nothing Works ƒ My PCIe Card Doesn’t WorkCheck the DIP switch settings on the Magma Host Card Windows RedHat9 LinuxWhen Nothing Works My Computer Hangs During Power Up My PCIe Card Doesn’t Work 1. Shut down the computer followed by the Magma expansion chassis Windows Error Codes Support for 3rdPP Party PCIe CardsDescription/Action Error CodeThis code indicates that there is a problem with the 3rd Party PCIe Card driverContacting Technical Support Chapter 8 How to Get More HelpFrequentlyAskedQuestionsFAQ 4. E-mail file to forums@magma.com Magma Debug Utility2. Run Magnostic.exe PCIScope Software Utility Technical Support request at wwwH.magma.com/sTU upportUT.H ReturningMerchandisetoMAGMA Multiple PCIe Expansion System Configurations Appendix A Need More PCIe Slots?Page Fan-Out Verify your configuration Daisy-Chaining D aisy-C hain Fan -O ut C om bination C onfiguration Combination ConfigurationsFan -O ut D aisy-C hain C om bination C onfiguration PCI e Card Conflicts Power-On Sequence for Advanced ConfigurationsTroubleshooting AdvancedConfigurations Page Finding the Problem Card MAC and LinuxIndustryCanada APPENDIX B ComplianceFCC/CE/UL AC INPUT SAFETY500Watt Power Supply Specifications DC OUTPUTMISCELLANEOUS 09-09917-01- A Manual, USER, EB7-x8, ROHS Magma 9918 Via Pasar, San Diego, CA 92126, USAPhone 858 530-2511 Fax 858