Panasonic CF-T4HWETZBM service manual ScrewB ScrewC ScrewB ScrewE ScrewH ScrewI ScrewF

Page 44

4.Screw tightening of bottom case (2)

The keyboard is inserted, and after tightening of the screw, the keyboard hooks are inserted in order of the following. 3-1. DXQT2+E12FNL(B:N11) is tightened. No.1 to No.4

3-2. DXQT2+D4FNL(F:N9) is tightened. No.5

3-3. DXQT2+E10FNL(E:N10) is tightened. No.6

3-4. DFHE5035ZA(H:N2) is tightened. No.7

3-5. DFHE5025XA(C:N501) is tightened. No.8

3-5. KIYE50000022(I:N500) is tightened. No.9

Screw(B)

Screw(C) Screw(B)

Screw(B)

Screw(B)

Screw(E)

Screw(H)

Screw(I)

 

 

Screw(F)

6.3.10. Affixation of Win Logo Label (XP), CENTRINO Label and Energy Star Label

In the inclination at the time of putting the win logo label, the CENTRINO label and energy star label the both ends difference is within 0.2mm

<Attention>

Confirm whether the paste of the label has overflowed after the win logo label and putting of the CENTRINO label and energy star label.

Win Logo Label(XP)

25mm

CENTRINO Label

25mm Energy Star Label

Top Case

57mm 25mm

42

Image 44 Contents
CF-T4 Contents Page Page Page Page Page Page Page Specifications Main SpecificationsWireless LAN Names and Function of Parts EXT Basic Procedures Diagnosis & RepairTroubleshooting Page Page Page Page Page ConnectionDiagram DFJS980ZAPower-on Self Test Boot Check Diagnosis by Error Code Outline of Self Diagnostic Tests Self Diagnosis TestPage Page Page Order of test flow selection Disassembly instructions Disassembly Flow ChartPreparation Removing the KeyboardRemoving the HDD Removing the Top CaseRemoving the Touch Pad Preparation perform the .2.1. , 6.2.2. and 6.2.4. firstRemoving the Main Board Removing the LCD Knob and the SpeakerRemoving the USB Board Removing the Wireless LAN Module Removing the Antenna Board L,R and the DC-IN CableRemoving the Modem Removing the Card Bus EjectorRemoving the LCD Unit Removing the LCD Unit and the LCD RearRemoving the Hinge Cover Remove the InverterAssembly knowhow of part LCD Reassenbly instructionsPutting of PET Tape Cable must not run aground on the damper Putting of gasket LCD Installation and Line processing of Speaker LCD cable processing 8mm LCD Cable Conductive ClothObtaining of Side Cover L Assembly of Touch PadProcessing of DC-IN Cable and Coaxial Cable Processing of USB Cable Screw tightening procedure of Each UnitProcessing of Modem Cable and LAN Cable Putting of tape ScrewB ScrewC ScrewB ScrewE ScrewH ScrewI ScrewF System Block Diagram Explanation of HarddwareDCIN&BATT Extended View Display SectionLCD Unit Assy / Pen Holder Section Cabinet Section Bottom Section Replacement Parts List Packing Material LCD Front TP DXQT2+E12FNL Screw
Related manuals
Manual 54 pages 31.82 Kb