Panasonic CF-T4HWETZBM Processing of Modem Cable and LAN Cable, Processing of USB Cable

Page 42

6.3.7.Processing of MODEM Cable and LAN Cable

Insert LAN cable previously

LAN Cable

Standard The cable

must enter in the set of 3-5mm

Give slack

to the drawing out part

USB Sheet

The cable is processed with the boss between ribs

MODEM Cable PET Tape

The state that the tension hangs is NG

The USB sheet is put and the cable is held

6.3.8.Processing of USB Cable

HDD Unit

PET Tape

Do not run aground in the boss

Process the line to 3 cables in parallel based on the difference of the concave part of the bottom case

Order is USB, modem, and LAN cable from this side

USB Board

 

 

The Cable must not enter under the

Boss

HDD unit

 

 

 

 

Do not run aground in the boss

PET Tape 02mm 02mm

6.3.9.Screw tightening procedure of Each Unit

When serving, the screw tightening is executed according to the undermentioned procedure.

1.Screw tightening of top case

1-1. DXQT2+E6FNL(K:N12) is tightened. No.1 to No.3

1-2. DXQT26+D8FCL(L:N15) is tightened. No.4 ,No.5

1-3. DXHM0056ZA(J:N6) is tightened. No.6

Screw(L)

Screw(K)

Screw(J) Screw(J)

Screw(K)

Screw(K)

40

Image 42
Contents CF-T4 Contents Page Page Page Page Page Page Page Specifications Main SpecificationsWireless LAN Names and Function of Parts EXT Basic Procedures Diagnosis & RepairTroubleshooting Page Page Page Page Page ConnectionDiagram DFJS980ZAPower-on Self Test Boot Check Diagnosis by Error Code Outline of Self Diagnostic Tests Self Diagnosis TestPage Page Page Order of test flow selection Disassembly instructions Disassembly Flow ChartPreparation Removing the KeyboardRemoving the HDD Removing the Top CaseRemoving the Touch Pad Preparation perform the .2.1. , 6.2.2. and 6.2.4. firstRemoving the LCD Knob and the Speaker Removing the USB BoardRemoving the Main Board Removing the Wireless LAN Module Removing the Antenna Board L,R and the DC-IN CableRemoving the Modem Removing the Card Bus EjectorRemoving the Hinge Cover Removing the LCD UnitRemoving the LCD Unit and the LCD Rear Remove the InverterAssembly knowhow of part LCD Reassenbly instructionsPutting of PET Tape Cable must not run aground on the damper Putting of gasket LCD Installation and Line processing of Speaker LCD cable processing 8mm LCD Cable Conductive ClothAssembly of Touch Pad Processing of DC-IN Cable and Coaxial CableObtaining of Side Cover L Screw tightening procedure of Each Unit Processing of Modem Cable and LAN CableProcessing of USB Cable Putting of tape ScrewB ScrewC ScrewB ScrewE ScrewH ScrewI ScrewF System Block Diagram Explanation of HarddwareDCIN&BATT Extended View Display SectionLCD Unit Assy / Pen Holder Section Cabinet Section Bottom Section Replacement Parts List Packing Material LCD Front TP DXQT2+E12FNL Screw