MACHINE OPERATION
PRE-RUN MACHINE INSPECTION
Do a
NOTE: See maintenance section for
STARTING MACHINE
NOTE: Perform
FOR SAFETY: Before starting machine, make sure that all safety devices are in place and operating properly.
1.Turn the machine power on.
2.Release the parking brake, if your machine is equipped with this option.
3.Engage the direction propel levers for the desired direction.
EMERGENCY STOP PROCEDURES
1.Release the propel levers.
2.Turn machine power off with key switch.
3.If an electrical problem is suspected push in emergency stop button, if machine is equipped with this option.
4.Apply brakes, if your machine is equipped with this option.
FILLING SOLUTION TANK
FOR SAFETY: Before leaving or servicing machine; stop on level surface, turn off machine and remove key.
1.Turn the machine power off.
2.Set the parking brake if your machine is equipped with this option.
3.Remove solution tank cover.
4.Fill the solution tank with clean water, leaving enough room for the required amount of cleaning solution. The solution tank capacity filled to 2” (5 cm) from bottom of fill inlet is 33 gallons (125 liters). The water must not be hotter than 140° F (60°C) to prevent damage to the tank.
5.Measure the chemical into the solution tank. Liquid chemicals should be added to the solution tank after filling with water. Dry chemicals should be thoroughly mixed before being added into solution tank. Commercially available, high alkaline floor cleaners, are
suitable for use in the solution system. NOTE: Read the chemical manufacturers recommended proportion instructions.
6.Replace solution tank cover.
! |
Flammable materials can cause an explosion or fire. Do not use flammable materials in the tanks.
CUTTER 36V (SCEX) 86037040 12/12/06 |