Panasonic CF-T4HWETZBM service manual Putting of tape

Page 43

2.Attachment preparation of Key Board 2-1. Putting of Heat Sheet KB Large

Inclination is set to 0.5mm or less.

Touch the KB hole

Inclination is set to 0.5mm or less.

Touch the KB hole

2-2. Putting of tape

0

0.5mm

 

 

 

 

 

 

 

 

0.5

1.5mm

0

1mm

8

1mm

0

1mm

0.5

1.5mm

 

 

 

 

 

 

 

 

Tape(KBD)(KBD)

KeyBoard exterior and FPC are parallel.

3.Screw tightening of bottom case (1)

The keyboard is inserted, and after the keyboard hooks are inserted in order of a and b while holding the keyboard, the screw tightening is done in the following order.

Note:The sheet metal must not run aground on the rib (Refer to the figure below). 2-1. DXHM0039ZA(D:N5) is tightened. No.1 to No.7

2-2. DXHM0057ZA(G:N7) is tightened. No.8 to No.12

Screw(G)

Screw(D)

Keyboard Hook b

 

 

Screw(D)

Screw(D)

 

 

 

 

 

 

Screw(D)

 

Screw(D)

 

 

Screw(D)

 

 

 

 

 

 

 

Screw(D)

 

Keyboard Hook a

 

 

 

 

 

 

 

 

 

Keyboard

OK

Screw(G)

 

 

Hook

Top Case Rib

 

 

 

 

 

 

 

 

Top Case

 

 

 

 

NG

Screw(G)

 

 

 

 

Screw(G)

 

Screw(G)

Assembly reference chart

 

 

41

Image 43
Contents CF-T4 Contents Page Page Page Page Page Page Page Main Specifications SpecificationsWireless LAN Names and Function of Parts EXT Diagnosis & Repair Basic ProceduresTroubleshooting Page Page Page Page Page DFJS980ZA ConnectionDiagramPower-on Self Test Boot Check Diagnosis by Error Code Self Diagnosis Test Outline of Self Diagnostic TestsPage Page Page Order of test flow selection Disassembly Flow Chart Disassembly instructionsRemoving the Keyboard PreparationRemoving the Top Case Removing the HDDPreparation perform the .2.1. , 6.2.2. and 6.2.4. first Removing the Touch PadRemoving the USB Board Removing the LCD Knob and the SpeakerRemoving the Main Board Removing the Antenna Board L,R and the DC-IN Cable Removing the Wireless LAN ModuleRemoving the Card Bus Ejector Removing the ModemRemove the Inverter Removing the LCD UnitRemoving the LCD Unit and the LCD Rear Removing the Hinge CoverReassenbly instructions Assembly knowhow of part LCDPutting of PET Tape Cable must not run aground on the damper Putting of gasket LCD LCD cable processing 8mm LCD Cable Conductive Cloth Installation and Line processing of SpeakerProcessing of DC-IN Cable and Coaxial Cable Assembly of Touch PadObtaining of Side Cover L Processing of Modem Cable and LAN Cable Screw tightening procedure of Each UnitProcessing of USB Cable Putting of tape ScrewB ScrewC ScrewB ScrewE ScrewH ScrewI ScrewF Explanation of Harddware System Block DiagramDCIN&BATT Display Section Extended ViewLCD Unit Assy / Pen Holder Section Cabinet Section Bottom Section Replacement Parts List Packing Material LCD Front TP DXQT2+E12FNL Screw