Panasonic CF-T4HWETZBM service manual Putting of PET Tape Cable must not run aground on the damper

Page 38

Putting of PET Tape

The cable must not run aground on the damper.

Along the LCD module and put the LCD cable (Inverter part) with the PET tape.

PET Tape

TS Board

LCD Cable (Inverter part)

Damper

Putting of rear damper

Rear Damper

Putting of PET Tape

Processing of inverter cable

PET Tape

Inverter Cable

The cable must not run aground on the cushion.

Conductive Cloth (LCD Cable)

LCD Cable

Insulation Sheet of edge match

Conductive Cloth (LCD Cable)

LCD Cable

Rib application putting of LCD front case 01mm

Extemals suiting of Frame outside 01mm

LVDS Cable of edge match

LCD Cable

LVDS Cable of edge match

01mm

The cable must not come in succession.

36

Image 38
Contents CF-T4 Contents Page Page Page Page Page Page Page Specifications Main SpecificationsWireless LAN Names and Function of Parts EXT Basic Procedures Diagnosis & RepairTroubleshooting Page Page Page Page Page ConnectionDiagram DFJS980ZAPower-on Self Test Boot Check Diagnosis by Error Code Outline of Self Diagnostic Tests Self Diagnosis TestPage Page Page Order of test flow selection Disassembly instructions Disassembly Flow ChartPreparation Removing the KeyboardRemoving the HDD Removing the Top CaseRemoving the Touch Pad Preparation perform the .2.1. , 6.2.2. and 6.2.4. firstRemoving the Main Board Removing the LCD Knob and the SpeakerRemoving the USB Board Removing the Wireless LAN Module Removing the Antenna Board L,R and the DC-IN CableRemoving the Modem Removing the Card Bus EjectorRemoving the Hinge Cover Removing the LCD UnitRemoving the LCD Unit and the LCD Rear Remove the InverterAssembly knowhow of part LCD Reassenbly instructionsPutting of PET Tape Cable must not run aground on the damper Putting of gasket LCD Installation and Line processing of Speaker LCD cable processing 8mm LCD Cable Conductive ClothObtaining of Side Cover L Assembly of Touch PadProcessing of DC-IN Cable and Coaxial Cable Processing of USB Cable Screw tightening procedure of Each UnitProcessing of Modem Cable and LAN Cable Putting of tape ScrewB ScrewC ScrewB ScrewE ScrewH ScrewI ScrewF System Block Diagram Explanation of HarddwareDCIN&BATT Extended View Display SectionLCD Unit Assy / Pen Holder Section Cabinet Section Bottom Section Replacement Parts List Packing Material LCD Front TP DXQT2+E12FNL Screw