22Power supply installation
4Lift the extractor lever to disconnect the power supply from the backplane connector.
5Pull the power supply out of the chassis.
6Install a new power supply (see "Installing the AC power supply" (page 18)) or install a power filler panel (see "Removing and installing a power filler panel" (page 17)).
—End—
Nortel Ethernet Routing Switch 8300
Installation — AC Power Supply
4.027 August 2007
Copyright © 2007, Nortel Networks