American Power Conversion VS 50, VS 100 user manual

Page 5
Image 5
Contents Magnum VS Vdc Power Systems Table of Contents Programming Output Relays Table of Figures Page General Information IntroductionDescription AccessoriesControl Power Distribution BackplaneUnpacking Equipment InstallationMechanical Installation AC Connections AC Power ConnectionsAC Power Cord Sets Planning the Battery installation Battery ConnectionsConnecting the Cables Recommended toCounter Electro-Motive Force Cemf Cell Connections Battery Temperature Probe Installation1 Cemf Connection Locations DC System GroundingCircuit Breaker Installation Load Protection InstallationGMT Fuse Installation Load ConnectionsGMT Fuse-protected Load Connections Circuit Breaker Protected Load Connections 30 or 60 aMonitoring and Relay Output Connections RJ45 Ethernet ConnectorFront Panel DB9 Connection Major, Minor and Relay 1 Output Connections1 Interface Connections Output Relay 2-6 Connections2 Output Relay Connections External Alarm Input ConnectionsController Module Installation Rectifier Module InstallationBattery Visual and Safety Inspection Electrical InstallationCommissioning Pre-Commissioning InspectionDC Power Up AC Power UpCommissioning Initial Set-upRectifier Test Battery Power UpLVD Test Circuit Breaker/ Fuse TestOutput Relay Battery Temperature CompensationFinal Inspection System Management Technical DescriptionRectifier Management Load Management System Status and Alarm ReportingSystem Current Monitor Circuit BreakersGMT Fuses Battery ManagementBattery Charging Battery Temperature Monitoring Battery ProtectionBattery Low Voltage Disconnect Counter Electro-Motive Force Module ConnectionsAlarm Outputs Output Relays Controls and IndicatorsExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringController Module Jumpers OperationDescription 1 Controller Card Jumper Locations Controller ModuleMagnum VS Controller Operation Using the RS-232 Comm PortOperation Using the 10/100 BaseT Ethernet Port Settings in Bold Settings DefaultDistribution/Breakers 00 mVSystem/Date & Time Power Modules/RectifiersDistribution/Fuses Batteries ParametersSeconds InputOutput DisableSeconds, 0.00 seconds Output RelaySystem/Out-Rly/Alias System/Preferences Programming Output Relays LVD OperationSystem Visual and Safety Inspection Preventive MaintenanceEquipment InspectionTest Battery Preventive Maintenance Procedure Battery Current TestBattery Temperature Test Final Inspection Alarm Summary System LT Alm System Temperature is below Minor Magnum VS 50 Power System SpecificationsMagnum VS 100 Power System AC InputDC Output Magnum VS Controller Environmental MechanicalCompliance APC Worldwide Customer Support Warranty Claims Terms of WarrantyNon-transferable Warranty Exclusions