Operation: Operation Procedures
Set the upstream mains power to the OFF or LOCKED OUT position. If the UPS has a dual mains supply, set both supplies to the OFF or LOCKED OUT position.
Electrical Hazard: Follow proper Lockout/Tagout procedures to remove access to the unit and physically label the unit as intentionally out of service.
How to turn the load on/off using the display interface
|
|
|
|
|
|
|
| UPS | Alarms |
|
|
| ||
|
|
| Power Dist | Log |
|
|
| Switch Gear | Admin |
|
|
| Environment | Help |
|
|
|
|
|
|
|
|
|
|
Turn UPS Off
Reboot UPS
UPS Into Bypass
UPS To Sleep
Press
Press
UPS Power Control
UPS Status
UPS Tests & Diags
UPS Configuration
Press
How to put the UPS in maintenance bypass operation
Use the display to put the UPS into bypass.
|
|
|
|
|
|
|
|
| UPS | Alarms | |
|
|
|
| ||
|
|
|
| ||
|
|
|
| Power Dist | Log |
|
|
|
| Switch Gear | Admin |
|
|
|
| Environment | Help |
|
|
|
|
|
|
|
|
|
|
|
|
Turn UPS Off
Reboot UPS
UPS into Bypass
UPS to Sleep
Putting UPS Into Bypass, please wait...
Press
Press
UPS Power Control
UPS Status
UPS Tests & Diags
UPS Configuration
Confirm:
UPS into Bypass?
NO, ABORT
YES, Into Bypass
UPS is now in bypass, press any key to return to previous menu
Press
Press
Confirm the transfer into bypass is complete.
Note: The H3 LED next to the Q3 switch on the
Set the Q3 switch on the
Note: The H2 LED beside the Q2 switch will illuminate, indicating that it is safe to operate the Q2 switch.
Symmetra PX 160 kW 400 V Operation | 9 |